| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 3 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. |
| 5 | Supply of RCC Pipea. 600 dia NP-3spigot |
| 6 | Carriage of RCC pipes over pucca roadupto 600 mm diameter |
| 7 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double RowProviding and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in double row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD.(F) 600 mm dia |
| 8 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at midlength). |
| 9 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary.. |
| 10 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 11 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Note: The rate is inclusive of Royalty Charges @ Rs. 29.00 per cum, Cesses charges @ Rs. 5.30 per cum and Compensation for earth@ Rs. 25.00 per cum for land owned/ arranged by the contractor. Royalty payment certificate in original from competent authority are to be produced along with the bill, otherwise amount due towards royalty @ Rs. 29.00 per cum and Cesses charges @ Rs. 5.30 per cum will be deducted from the bills of work. A) Beyond 500 metre and upto 1.00 km |
| 12 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 13 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags , (tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 Cum/bag. |
| 14 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. Please Enable Macros to View BoQ information |