| 1 | Repair & Service of Main Motor Driven Pump & Motor (75 HP)- including replacement of Rotating Unit Assembly with Mechanical Seal, rewinding, bearings etc. complete in all respect & upto entire satisfaction of Engineer in-charge |
| 2 | Repair & Service of Main Engine Driven Pump (75 HP)- including replacement of Rotating Unit Assembly with Mechanical Seal, rewinding, bearings etc. complete in all respect & upto entire satisfaction of Engineer in-charge |
| 3 | Repair & Service of Jockey Pump & Motor - (12.5 HP)- including replacement of Pump Back Pull out Assembly with Mechanical Seal, rewinding, bearings etc. complete in all respect & upto entire satisfaction of Engineer in-charge |
| 4 | Repair & Service of Mono Block Pump- (5 HP)- including rewinding, Bearing Gland dori change etc. complete in all respect & upto entire satisfaction of Engineer in-charge |
| 5 | Repair & Service of Row water steel Pump- (5.5 HP)- including rewinding, Bearing Gland dori change, steel soft bush etc. complete in all respect & upto entire satisfaction of Engineer in-charge |
| 6 | Repair & Service of Mono Block Pump- (7.5 HP)- including rewinding, |
| 7 | Bearing Gland dori change etc. complete in all respect & upto entire satisfaction of Engineer in-charge |
| 8 | Repair & Service of Mono Block Pump- (10 HP)- including rewinding, Bearing Gland dori change etc. complete in all respect & upto entire satisfaction of Engineer in-charge |
| 9 | Servicing of 62 kVA Diesel Generator set including inspection and testing of overload relay system. Checking and replacement & calibration of overload relay, tightening of electrical connections, and functional testing under load conditions.Complete filter service including replacement of engine oil filter, diesel filter, and air filter. Draining and refilling of engine oil (as required), cleaning of fuel lines, inspection of cooling system, and general preventive maintenance. |
| 10 | Overall health check of DG set, change new battery terminals cleaning, checking alternator output, and trial run after service completion. |
| 11 | Replacement of Electrical panels (Big) including fully automatic Star Delta starter with thermal overload relay with inbuilt/separate single phase preventer , contactor, Timer, Push Buttons and Auto-manual selector switch etc including its mounting on the wall and control cables for starting of the motor complete as required. |
| 12 | Prividing & installing of Overload relay including wiring, testing & commissioning complete in all respect & upto entire satisfaction of Engineer in-charge |
| 13 | Supplying, fixing, testing and commissioning of butterfly valve of PN 1.6 rating with bronze/ gunmetal seat duly ISI marked complete with nuts, bolts washers, gaskets conforming to IS 13095 of following sizes as required: |
| 14 | 75mm Dia |
| 15 | Supplying, fixing, testing and commissioning of butterfly valve of PN 1.6 rating with bronze/ gunmetal seat duly ISI marked complete with nuts, bolts washers, gaskets conforming to IS 13095 of following sizes as required: |
| 16 | 150mm Dia |
| 17 | Credit of Old materials/parts Please Enable Macros to View BoQ information |