| 1 | Description of works |
| 2 | Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness etc complete as per the direction of site icnharge. |
| 3 | Earthwork excavation in hard soil including removal ofexcavated materials and disposing the same up to a distance of 50mtrs and including initial lead and liftetc complete as per the direction of site icnharge. |
| 4 | Provision for providing and laying rubble soling 0.15 mthick including ramming consolidating etc. complete as directed by site incharge. |
| 5 | Providing and laying Cast in situ/Ready Mix cementconcrete in M10 of trap/granite/quartzite/gneiss metal for foundation and bedding including bailing out water, steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade). etc complete as per the direction of site icnharge. |
| 6 | Providing uncoursed rubble masonry of trap / granite /quartzite / gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc complete as per the direction of site icnharge. |
| 7 | Providing and fixing M.S grill fencing in between 'thesteel post of size 100x100x5mm hollow section of 1.90 m. height'(0.30 m. emdeded in concrete) using 16 mm square bars( 22 nos. )to a height of 1.50 meters. fabricated by MS 'L' angle of size 50 x 50 x 6 mm forframe and supported with horizontal of M.S. flat of size 50 x 6 mm three nos. at the equal intervals as per the sketch enclosed including applying two coat of smoke grey color enamel paint after applying a coat of iron primer etc complete as per the direction of site icnharge. |
| 8 | Providing and fixing M.S Gate fencing in between 'C'channel post of size 100x50x5mm thickness 2.35m. height (0.30 m. emdeded in concrete) using 20 mm bars( 35 nos. ) to a height of 2.15 meters. fabricated by MS 'L' angle of size 50 x 50 x 6 mm & 40x40x 5mm for frame as shown in detailed sketch enclosed including applying two coat of smoke grey colour enamel paint after applying a coat of iron primer etc complete as per the direction of site icnharge. |
| 9 | Provision for fabricating and fixing structural steel work in G.I square pipes truss as per details drawing including cutting, fabricating hoisting erecting fixing in position with welded connection as per directed etc complete as per the direction of site icnharge. |
| 10 | Provision for fixing the G. I sheet for roof and vertical side of tin shade and windows with hooks/bolts as per designed drawing as directed etc complete as per the direction of site icnharge. |
| 11 | Provision for providing and making of office table and furniture made with 20 mm thick century make ply with 1.2mm thick Sun mica board with all necessary fastenings, standard aluminium lock, stopper, handle etc. complete.(Including all material and labour) |
| 12 | Main Table Top plywood = 1 x 1 x 2.43 x 1.07 = 2.60 sqm Vertical ply = 1 x 5 x 1.00 x 0.77 = 3.85 sqm Drawer horizontal ply = 12 x 2 x 0.56 x 0.12 = 1.61 sqm Drawer Vertical ply = 12 x 2 x 0.62 x 0.12 = 1.78 sqm Drawer bottom ply = 12 x 2 x 0.56 x 0.62 = 8.33 sqm Right side cabinets ply = 1 x 1 x 0.56 x 0.77 = 0.43 sqm Back side ply = 1 x 1 x 2.30 x 0.77 = 1.77 sqm Drawer handle = 12 nos etc complete as per the direction of site icnharge. |
| 13 | Computer Table Horizontal Top ply= 1 x 1 x 1.21 x 0.60 = 0.73 sqm Vertical ply= 1 x 3 x0.66 x 0.60= 0.19 sqm Table Drawer horizontal ply = 1 x 2 x 0.20 x 0.04 = 0.02 sqm Table Backside horizontal ply = 1 x 1 x 1.26 x 0.77 = 0.97 sqm Table vertical ply = 1 x 3 x 0.54 x 0.77 = 1.25 sqm Table Drawer vertical ply = 1 x 2 x 0.47 x 0.12 = 0.11 sqm Table Drawer horizontal ply = 1 x 2 x 0.52 x 0.12 = 0.12 sqm Computer table cabinethorizontal ply = 1 x 2 x 0.52 x 0.67 = 0.70 sqm Computer table foot rest ply = 1 x 1 x 0.54 x 0.20 = 0.11 sqm Drawer handle = 1.00 nos etc complete as per the direction of site icnharge. |
| 14 | Sliding Cupboard Horizontal Top and bottom ply= 1 x 2 x 2.20 x 0.40 = 1.76 sqm Vertical ply= 1 x 2 x 2.20 x 0.77= 3.38 sqm Inner side partition ply = 1 x 2.20 x 0.36 = 0.79 sqm back side ply = 1 x 2.20 x 0.77 = 0.79 sqm Drawer handle = 4.00 nos @ Rs. 175.00 (As per local market rate) Main Cupboard Front and back ply = 2 x 2 x 0.90 x 2.14 = 7.70 sqm Side ply = 2 x 2 x 0.40 x 2.14 = 3.42 sqm Top and bottom ply = 2 x 2 x 0.90 x 0.40 = 1.44 sqm Drawer handle = 4.00 nos etc complete as per the direction of site icnharge. |
| 15 | Total plywood qty = 43.85 Sqm |
| 16 | Total sun mica qty = 1 x 2 x 43.85 = 87.70 Sqm |
| 17 | Drawer sliding Patti 26.00 nos |
| 18 | Fevicol 15.00 kg |
| 19 | 6.00 nos Carpenter |
| 20 | 6.00 nos Unskilled labour |
| 21 | Provision for providing necessary accessories for CAoffice at Bassein Fort etc. complete. |
| 22 | Repairing of existing CA and Staff Chairs \\"Repairing of High Black Chair with Cushion |
| 23 | Replacing of out of Hydraulics of Staff sitting chairs |
| 24 | Replacing of broken wheels of Staff Chairs |
| 25 | Purchasing and installation of street lights outside of CA office etc. complete |
| 26 | 100 W Street Light |
| 27 | 0.75\\" Plastic Patti |
| 28 | 1 Sq. mm Wire |
| 29 | 25x8 Screw (12 Pcs) |
| 30 | Rawal Plug |
| 31 | Rawal Plug |
| 32 | Charges of electrician for fixing street lights and other necessary electric works |
| 33 | Maintenance of existing inverter battries by cleaning and refilling distil water etc. complete. |
| 34 | Distil Water (5 Liters can) |
| 35 | Electrician charges for fitting of inverter including dissemble from old office and reassemble in new office and other necessary electric works. etc complete as per the direction of site icnharge. |
| 36 | GST 18% of SL.No.1 to 34 Please Enable Macros to View BoQ information |