| 1 | Cartage of PCC Pole 8.5/9/11 Mtr. Long From Central store GZB/Shahibabad JE Store (Dist.) to site of work including loading unloading of both ends. |
| 2 | Cartage of ST Pole 8.5/9/11/13 Mtr. Long From Central store GZB/Shahibabad JE Store (Dist.) to site of work including loading unloading of both ends. |
| 3 | Carriage of other line material (Other than pole ) as MS Channel, Dropper Channel, MS angle, Cross Arm, T-Off Channel of various size Etc from Central store GZB/Shahibabad /JE store (Dist.) to site work including loading unloading of both ends. |
| 4 | Carriage of Conductor/G.I Wire/XLPE cable & ABC Cable of various size Etc from Central store GZB/Shahibabad /JE store (Dist.) to site work including loading unloading of both ends. |
| 5 | Carriage of other line material (Other than pole ) as Iron stay rod(220), TPMO (220), Fuse set (83) , Disc & Pin insulator(540), LT Distribution Box (25) (Single/3 Phase) of various size Etc from Central store GZB/Shahibabad /JE store (Dist.) to site work including loading unloading of both ends. |
| 6 | Excavation of Foundation pit in Normal Soil/Soft and Hardsoil Rock and its back filing and leveling Erection of Single pole with PCC Pole/ ST Pole encluding Fixing of all accessories after digging of a suitable size pit for each pole. Work shall be done as per RESPO specification.Single PCC Pole/ST Pole 8.5/9/11/13 Mtr. Long. |
| 7 | Excavation of Foundation pit in Normal Soil/Soft and Hardsoil Rock and its back filing and leveling Erection of Double pole with PCC Pole/ ST Pole encluding Fixing of all accessories after digging of a suitable size pit for each pole. Work shall be done as per RESPO specification.Double PCC Pole/ST Pole 8.5/9/11/13 Mtr. Long. |
| 8 | Concreting /Grouting of PCC Pole /ST Pole 8.5/9/11/13 Mtr. Long of support up to ground level (300 MM above the ground level for ST Pole)including back filling and ramming work shall be done as per RESPO specification. |
| 9 | Erection, Fixing of stay rod 16x1800 mm after digging of a suitable size pit shall be done as per RESPO specification including fixing of stay wire clamp, Egg Insulator and nuzzling etc. |
| 10 | Fabrication & Fixing of M S Top Channal, M S Dropper Channel , T-off Channel , Cross Arm & M S Base angle etc including cutting & holes, Fuse Set & TPMO as per RESPO drawing and norms. |
| 11 | Earthing of supports with M.S. Earth Rod 20x2500 mm long including driving of M.S. Rod 1 Mtr. Apart from support 0.5 Mtr. Below ground level and connecting with support with the help G.I wire No. 6 SWG & appropriate LUG. |
| 12 | Laying, Binding, Sagging and jumpring, etc. Of ACSR Weasel/ Rabit Conductor on the pole with guarding as per requirment as per RESPO specification and as per direction of engineer in charge it includes cost of labor, T&P Carrier etc. Prepared for proper completion of work. |
| 13 | Construction of plinth of T/F Complete with all material & shuttering etc. Shall be done as per RESPO specification. |
| 14 | Carriage of 11 KV metering cubical complete from Central store GZB / Shahibabad /JE Store (Dist.) to site of work including loading unloading of both ends. (Distance up to 100x2 Km.) |
| 15 | Carrige of CT/PT Units 11 KV/ 33 KV from Central store GZB / Shahibabad /JE Store (Dist.) to site of work including loading unloading of both ends. (Distance up to 100x2 Km.) |
| 16 | Carrige of 11 KV 16/25/63/100/250 KVA Transformer from Central store GZB/ Shahibabad/JE store (Dist.) to site of work including loading unloading of both ends with the help of Crane ( Distance up to 100x2 km.) |
| 17 | Mounting, Placing & Connection on LT/HT of 11 KV 16/25/63/100/250 KVA Transformer with help of crane. |
| 18 | Carrige of 11KV old and used 16/25/63/100 KVA Transformer from site of work to JE store (Dist.) including loading unloading of both ends with the help of Crane (Distance up to 100x2 Km.) |
| 19 | Dismounting & Disconnection from LT/HT side of 11 KV 16/25/63/100 KVA Transformer |
| 20 | Dismounting & Disconnection of 11 KV metering cubical with dismentling & removing of 11 KV old cable. |
| 21 | Laying of 11KV XLPE Cable 3x35-3x70+3x120-3x185sqmm and completion work properly, as per RESPO/Norms, and as per direction of site incharge. |
| 22 | Laying of LT ABC with LT distribution box of various capacity and completion work properly, as per RESPO/Norms, and as per direction of site incharge. |
| 23 | Excavation in soft soil for cable trench and Refilling the same the cable protected with local sand cushioning and bricks protection along the cable while buried directly in ground in 2.5 feet depth. |
| 24 | Fixing of Cable Box on 3 core 35 to 185 Sqmm. (O/D & I/D) |
| 25 | Mounting of CT/PT Unit 11 KV/33 KV |
| 26 | Installation 11 KV metering cubical complete . Work shall be done as per RESPO specification. |
| 27 | Providing & Fixing MS holding Clamps for ST Pole/Pcc Pole made from 50x6 mm MS Flat. |
| 28 | Providing & Fixing MS F Clamps for ST Pole/Pcc Pole made from 50x6 mm MS Flat. |
| 29 | Providing & Fixing MS L.T Pin Clamps for ST Pole/Pcc Pole made from 50x6 mm MS Flat. |
| 30 | Providing & Different sizes of nuts and bolts for different type of clamps with washers of best quality as per requirement |
| 31 | Providing and Fixing of Fencing, Tail-less Unit Above 250 kvaT/F & SMC LT Fuse Set Box for upto 100 kva |
| 32 | Laying of Various Size UG cable via trenchless method with the cost of HDPE Pipe suitable size. Excavation of trench/pit of required size & depth including cutting of road surface (earthen/WBM/bituminous/CC/tiles), barricading, traffic diversion, dewatering and protection of nearby services. After completion of work, backfilling in layers with proper compaction and restoration of site/road to original condition as per authority norms. Any settlement during defect liability period shall be rectified by the contractor at his own cost. |
| 33 | Dismantelling of Old & Unused line from Site and Submitted to Store Center including loading and unloading charges of both sides. |
| 34 | Providing & Fixing Of PG Clamps for connection/Jumpering of conductor as per conductor size. |
| 35 | Providing & Fixing Of HT & LT side LUG with all side & all connection of Distribution Transformers With appropriate size with Punching 25 to 250 KVA |
| 36 | Providing & Fixing of I-hook, J-hook, Piercing Clamps, Dead end Clamp & Suspension Clamp For Cable Support as Per RESPO norms. |
| 37 | Dismentling of old & used STP/PCC Pole from Site and Submitted to Store Center including loading and unloading charges of both sides. |
| 38 | Providing & Chemical Earthing of 11 KV Meter Cubical & DT Transformer above 250kva With G.I Strip And Nut Bolt / Welding. Please Enable Macros to View BoQ information |