| 1 | [PWD Building SCHEDULE, Page - 1 / Item No. -2] Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The Item No. includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1.500 mm. |
| 2 | [PWD Building SCHEDULE, Page - 1 / Item No. -2 ] Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand |
| 3 | [Ref- Item No. 1, Page No. 14 >> 3rd Corrigenda- Sl No. 1, Page No. 1] Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 4 | [PWD Building SCHEDULE, Page - 35 / Item No. -22. II) (3rd Corrigenda)] Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety In ground floor 1:3:6 proportion. |
| 5 | PWD Building SCHEDULE,Page - 24 / Item No. -4. ii) (3rd Corrigenda)] Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. |
| 6 | PWD Building SCHEDULE,Page - 26 / Item No. -10. ii) (3rd Corrigenda)] Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (ii ) River Bazree |
| 7 | [PWD Building SCHEDULE,Page - 42-43 / Item No. -36.] Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (f) 25 mm to 30 mm shuttering without staging in foundation. |
| 8 | [PWD Building SCHEDULE,Page - 42 / Item No. -36.] Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 9 | PWD Building SCHEDULE,Page - 43 / Item No. -40. (10th Corrigenda)] Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m. Tor steel/Mild Steel, II. JSW/SRMB/SHYAM/JSPL. |
| 10 | PWD Building SCHEDULE, Page - 7 / Item No. - 15) iv) (3rd Corrigenda)] Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth |
| 11 | PWD Building SCHEDULE, P-3, SL-8 (3rd Corrigenda)] 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 12 | PWD Building SCHEDULE, Page - 189 / Item No. - 1) iv) (3rd Corrigenda)] Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] With 1:4 cement mortar 20 mm thick plaster. |
| 13 | PWD Building SCHEDULE, Page - 189 / Item No. - 1) iv) (3rd Corrigenda)] Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] With 1:4 cement mortar 15 mm thick plaster. |
| 14 | PWD Building SCHEDULE, Page - 189 / Item No. - 1) iv) (3rd Corrigenda)] Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] With 1:4 cement mortar 10 mm thick plaster. |
| 15 | PWD Building SCHEDULE, Page - 192 / Item No. - 15] Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE: Cement 0.152 cu.m per100 sq.m. |
| 16 | [PWD Building SCHEDULE, Page - 115 / Item No. - 4] Supplying, Fitting & Fixing Factory made P.V.C. door frame of size 50 mmx47 mm with a wall thickness of 5 mm, made out of extruded 5 mm, PVC sheet miter cut at two corners and joined with two nos of 1.5 mm long brackets of 15 mm x15 mm M.S. square tube. The two vertical door profiles are to be reinforced with 19 mmx 19 mm M.S. Square tube of 19 gauge, weather seal to be provided through out the frame. The door frame shall be fixed with the wall using 65/100 mm long M.S. Screws through the frame by using P.V.C fasteners. A minimum of 4 Nos of screws to be provided for each vertical member and minimum 2 Nos for horizontal member etc. complete as per Manufacturer‟s specification and direction of Engineer-in-Charge. |
| 17 | [PWD Building SCHEDULE, Page - 135 / Item No. - 27] PVC Door Shutter-30 mm thick: Supplying fitting and fixing P.V.C. door shutter of approved quality & shade in position, the style & rail of the P.V.C. door shutter will be made of rigid P.V.C. multicavity hollow chamber of 59 mm x30 mm section with 2.0 mm (+/-0.2 mm) wall thickness.Horizontal & vertical section shall be fixed to each other by self tapping screws and 1 solid polymeric or M.S. galvanised tubular 'L' shaped bracket 100mm x 200mm in each corner of the shutter frame for placing hinges. Polymer based multicavity hollow section of 120 mm x30mm with 2.0 mm (+/- 0.2 mm) wall thickness will be fitted in the middle, reinforced by solid polymer bar of 200 mm long at both ends and screws from both sides as lock rail. The section frame will then be fitted in by PVC panels of size 100 mmx25 mm with wall thickness of 1.2 mm (+/- 0.2 mm) and 2 nos. of 6 mm dia bright rod will be inserted horizontally with both side check and nut system and stretches where fixing of hinges / hasp bolt / tower bolt / door ring are required to be strong enough to with stand wear and tear. The rate is inclusive of cost of all materials, labour, and hire of tools and plants and appliancesi/c carriage of all materials taxes and all other incidental charges complete. |
| 18 | [Ref- Item No. 35)A, Page No. 64 >> 3rd Corrigenda- Sl No. 22, Page No. 34-35] Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (A) Floor With Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick cement slurry at back side of tiles usingcement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative. |
| 19 | PWD Building SCHEDULE, Page - 64 / Item No. - 35) iv) (3rd Corrigenda)] Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall : With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative. |
| 20 | [Ref- Item No. 13 , Page No. 104 >> 3rd Corrigenda- Sl No. 10, Page No. 91] M.S. or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr. |
| 21 | [Ref- Item No. 10, Page No. 196] Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats. |
| 22 | PWD Building SCHEDULE, Page - 200/Item No. -1. a] Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. On steel or other metal surface : With super gloss (hi-gloss) - Two coats (with any shade except white) |
| 23 | PWD Building SCHEDULE, Page - 200 / Item No. - 2. b) iv)] Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On steel or other metal surface : With super gloss (hi-gloss) - Two coats (with any shade except white) |
| 24 | PWD S & P SCHEDULE, Page - 6 / Item No. - 7] Supplying, fitting and fixing bib cock or stop cock. (a) (i) Chromium plated Bib Cock short body (Equivalent to Code No. 511 & Model - Tropical / Sumthing Special of ESSCO or similar brand). |
| 25 | PWD S & P SCHEDULE, Page - 6 / Item No. - 7] (b) (i) Chromium plated Stop Cock (Equivalent to Code No. 513(A) & 513(B) & Model - Tropical / Sumthing Special of ESSCO or similar brand). |
| 26 | PWD S & P SCHEDULE, Page - 6 / Item No. - 7] (d) (i) Chromium plated angular Stop Cock with wall flange (Equivalent to Code No. 5053 & Model - Florentine of Jaquar or similar brand). |
| 27 | PWD S & P SCHEDULE, Page - 29/ Item No. - 1 ] Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007. with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (a) For Exposed Work (i) CPVC Pipes Class-1, SDR-11 25mm dia |
| 28 | PWD S & P SCHEDULE, Page - 29/ Item No. - 1 ] Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007. with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (a) For Exposed Work (i) CPVC Pipes Class-1, SDR-11 20mm dia |
| 29 | PWD S & P Schedule,Page - 37/Item No. -6] Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer. (a) 500 litre capacity |
| 30 | PWD S & P Schedule, Page No.-37/Item No. 10] Labour for hoisting plastic water storage tank. Upto 1500 litre capacity. Upto 1st story from G.L. |
| 31 | PWD S & P Schedule, Page No-38/Item No. 13] Labour for punching hole in plastic water storage tank upto 50 mm dia. |
| 32 | PWD S & P SCHEDULE, Page - 41 / Item No. - 1] Wash basin vitreous china of approved make (without fittings) supplied,fitted and fixed in position on 75mm X 75 mm X 75 mm wood blocks and C.I. brackets including two coats of painting of C.I. brackets. (iv) Angle back wash basin 400 mm X 400 mm |
| 33 | [PWD S & P SCHEDULE, Page - 68-69 / Item No. - 23] Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992. (A) (i) Single Socketed 3 Meter Length. (a) 75 mm |
| 34 | [PWD S & P SCHEDULE, Page - 68-69 / Item No. - 23] Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992. (A) (i) Single Socketed 3 Meter Length. (b) 110 mm |
| 35 | [PWD S & P SCHEDULE, Page - 68-71 / Item No. - 23] Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992. (B) Fittings x) Bend 87.5º (b) 110 mm |
| 36 | [PWD S & P SCHEDULE, Page - 68-71 / Item No. - 23] Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992. (B) Fittings x) Bend 87.5º (a) 75 mm |
| 37 | [PWD S & P SCHEDULE, Page - 68-71 / Item No. - 23] Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992. (B) Fittings xv) Vent Cowl (b) 110 mm |
| 38 | [PWD S & P SCHEDULE, Page - 68-71 / Item No. - 23] Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992. (B) Fittings xvi) Pipe Clip (a) 75 mm |
| 39 | [PWD S & P SCHEDULE, Page - 68-71 / Item No. - 23] Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992. (B) Fittings xvi) Pipe Clip (b) 110 mm |
| 40 | PWD S & P SCHEDULE, Page - 79 / Item No. - 4] Supplying, fitting and fixing Orissa pattern water closet in white glazed vitreous chinaware of approved make in position complete excluding 'P' or 'S' trap (excluding cost of concrete for fixing). (i) 580 mm X 440 mm |
| 41 | PWD S & P SCHEDULE, Page - 80 / Item No. - 6] Supplying, fitting and fixing Flat back urinal (half stall urinal) in white vitreous chinaware of approved make in position with brass screws on 75 mm X 75 mm X 75 mm wooden blocks complete. (ii) 470 mm X 280 mm X 340 mm |
| 42 | [PWD S & P SCHEDULE, Page - 80 / Item No. - 7) ] Supplying, fitting and fixing Squating plate with integral flushing in white vitreous chinaware of approved make in cement concrete (6:3:1) with jhama chips complete. (Payment of concrete will be paid seperately). (i) 450 mm X 350 mm |
| 43 | PWD S & P SCHEDULE, Page - 87 / Item No. - 1) 5th Corri Page 2] Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling, 15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20 mm.thick (1:4) plaster to bottom of the pit. ii) With Bazree (N.B Variety) (Other than SAIL/TATA/RINL) |
| 44 | PWD S & P SCHEDULE, Page - 88 / Item No. - 3) 5th Corri Page 11] Construction of septic tank of different capacities as per approved drawing with 1st class brick work in cement mortar (1:4) including two 560 mm dia. R.C.C. manhole cover(heavy type)of approved make supplied, fitted and fixed in the 100mm thick R.C.C (1:1.5:3) top slab with necessary fittings, 20mm thick cement plaster (4 : 1) with neat cement finish to the internal surfaces and 15 mm thick cement plaster (4 : 1) to outside wall upto 200 mm below G.L floor finished with 25 mm thick grey artificial stone over 100 mm thick R.C.C(1:1.5:3) bottom slab including supplying, fitting and fixing all necessry specials, fittings, S.W. tees, C.I. foot rest etc. including excavation earth in all sorts of soil, shoring, bailing out and pumping out water as necessary, ramming, dressing the bed and fefilling the sides of the tanks with earth, removing spoils, filling up the chamber with clear water, removing foreign materials from the chamber and including constructing attached inspection pit as per approved drawing and connecting all necessary pipes, joints etc. with internal plaster work and artificial stone flooring is to be done with admixture of water proofing compound @ 0.5% by weight of cement with all costs of labour and materials. Note:- (i) Finished level of Septic Tank should be 400 mm. from Ground Level. (ii) Height of 50 mm. Ventilation pipe &Mosquito proof mesh, should be follwed as per IS:2470,PartI.Payment will be made separetly on the basis of actual height based on relevant I.S.Code. (i) For 10 users B) With Bazree (N.B Varity) (SAIL/TATA/RINL) |
| 45 | PWD S & P SCHEDULE, Page - 89 / Item No. - 4) 7th Corri Page 6, Sl-4] Construction ol circular soak well 3.5 metre deep in all types of sandy soils with dry brick work upto1.6 metre from the bottom having 50 mm intermediate cement brick work (1:4) band all round and cemenf brick work (I:4) upto 0.90 mtr from top with 20mm thick cement plastering (2:4) to, I5mm thick cement plaster (1•4) on outer face and 6 mm thick cement plaster (1-4) on top of the R.C.C. cover slab Including filling bottom 1.00 metre of inside of the well with brick metal including R.C.C. cover slab of 100 mm thick with cement cone (1:I.5:3) with necessary reinforcement and shuttering including one 560mm dia. R.C.C. manhole cover with necessary fittings, making nacessary arrangements for pipe connections excavation of well including With 250 mm thick dry brick wark and 250 mm thick cement brick work (1:6) and 1.00m inside dia. (SAIL/TATA/RINL) |
| 46 | [Local Market L.S. Rate] General information chart (approx size of 3'x2') in front side wall of the proposed project, including Painting, Lettering, etc complete as per direction. |
| 47 | GST 18% |
| 48 | CESS 1% Please Enable Macros to View BoQ information |