| 1 | Material and labour for XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area of following complete including connection with panel with suitable thimble and all connected items complete all as specified and as directed including taking down existing old cable.(a) 25 sqmm 4 core. |
| 2 | (b) 16 sqmm 4 core. |
| 3 | (c) 10 sqmm 4 core. |
| 4 | (d) 10 sqmm 2 core. |
| 5 | (e) 6 sqmm 2 core. |
| 6 | Excavation for cable trenches in any type of soil, depth upto 1.2 m including dressing of sides lift upto 1.5 mtr, including getting out the excavated soil, refilling with sand or good soil after laying of cable / pipe etc. in layers of 20 cm, ramming, watering and and disposal of surplus excavated soil as directed, within a lead of 50 m.in all kinds of soil within a lead of 50 metres complete all as specified and as directed. |
| 7 | Supply and laying 50 mm bore HDPE double wall corrugated (DWC) pipes confirming to IS 16098 complete laid in ground /floor/ wall complete all as specified and as directed. |
| 8 | M&L for GI pipe light grade 80 mm dia confirming to IS 1239 fixed to pole with MS clamps of suitable size nut & bolts/ laid in trenches complete all as specified and as directed including taking down old pipe. |
| 9 | M&L for GI pipe light grade 50 mm dia confirming to IS 1239 fixed to pole with MS clamps of suitable size nut & bolts/laid in trenches complete all as specified and as directed including taking down old pipe. |
| 10 | M&L for GI pipe light grade 40 mm dia confirming to IS 1239 fixed to pole with MS clamps of suitable size nut & bolts/laid in trenches complete all as specified and as directed including taking down old pipe. |
| 11 | Excavation for cutting/ boring RCC/ bitumen road for laying of underground cable of any size and making good with PCC complete all as specified and directed. |
| 12 | Supply, installation, testing and commissioning of Retrofitted emmision control device (RECD) approved by CPCB for family of DG set and should have COP suitable for 75 kVA Diesel Generator set of any make complete all as specified and directed and having following specifications:-•DG safety Alarm system included•Material Construction - SS304•Temperature Indication and monitoring•Pressure Indication and monitoring•PM Capture/PM reduction capacity 85-90%•High Heat Resistance•Low exhaust Resistance•Easy to Install.* Durability period should be 4000 hrs or 12 years whichever is earlier |
| 13 | Make/ Manufacturer: Cummins Technologies India Pvt Ltd/ Inventive Gas Equipment / PI Green Innovations Pvt Ltd/Novorbis Itus Pvt LtdNote: (i) Emission test report of engine before and after installation should be submitted by the contractor (ii) Device Should be type Approved CPCB for family of DG sets and required (iii) Contractor should submit OEM authorization Certificate (iv) The device including enclosure should include an Oxidation chamber and Passive Regeneration Trap. A manual valve be given after the first stage (Oxidation stage) and before the second stage (Passive Regeneration Trap) of the DOFF, Noise attenuation is with in the permissible limits, Equipped with mechanical pressure relief system, capturing chamber made of resistance process, treated mild steel etc. as required. (v) The RECD device provided by the seller should be equipped with a remote Data Monitoring system certified by ICAT/ ARAI providing essential information recorded at every 15 minutes, including but not limited to:(a). Energy consumption. (b). Running Hours. (c). warning related to ECD diagnosis for the following conditions:* Complete loss of particulate capture function.* Removal of the ECD system.* Failure of ECD system. Please Enable Macros to View BoQ information |
| 14 | Make/ Manufacturer: Cummins Technologies India Pvt Ltd/ Inventive Gas Equipment / PI Green Innovations Pvt Ltd/Novorbis Itus Pvt LtdNote: (i) Emission test report of engine before and after installation should be submitted by the contractor (ii) Device Should be type Approved CPCB for family of DG sets and required (iii) Contractor should submit OEM authorization Certificate (iv) The device including enclosure should include an Oxidation chamber and Passive Regeneration Trap. A manual valve be given after the first stage (Oxidation stage) and before the second stage (Passive Regeneration Trap) of the DOFF, Noise attenuation is with in the permissible limits, Equipped with mechanical pressure relief system, capturing chamber made of resistance process, treated mild steel etc. as required. (v) The RECD device provided by the seller should be equipped with a remote Data Monitoring system certified by ICAT/ ARAI providing essential information recorded at every 15 minutes, including but not limited to:(a). Energy consumption. (b). Running Hours. (c). warning related to ECD diagnosis for the following conditions:* Complete loss of particulate capture function.* Removal of the ECD system.* Failure of ECD system. Please Enable Macros to View BoQ information |