| 1 | Earth work in cutting or in embankment in odinary soil, excavation to be in the from of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.5m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as directed by Engineer-in-Charge.Earth work in making bundha U/s & down stream of site |
| 2 | Earth work in making ramp. embankment by power transported earth with a lead 200m and lead up to 1km including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding Royalty will be applicable from time to time on Govt. order. |
| 3 | Earth work in foundation in dry ordinary soil i/c lift upto 1.50m & lead upto 30m and including backfilling, watering and ramming of excavated soil into the trenches or into the space between the structure and the the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by Engineer-in Charge upto a distance of 30M from the foundation trenches . |
| 4 | Providing and laying Cement concrete (1:2:4) with cement , coarse sand and stone grit including cost of all material, labour and T&P etc.complete. |
| 5 | Steel Reinforcement including cutting, bending, binding, placing in position including cost of all material, labour and T&P etc.complete. |
| 6 | Centering & shuttering for C.C. Work including cost of centering and shuttering material ,labour & T&P required for proper complition of work |
| 7 | Centering & shuttering for R.C.C./R.B. Work including cost of centering and shuttering For Bridge slab above 3M span |
| 8 | Supplying and laying one layer of tarfelt or any other equivalent approved material at the junction of wall and roof or at any place as per dirction of E/I including neccessary over lap giving one coat of approved mastic paint below the tarfelt and including supply of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer in charge. |
| 9 | Providing and laying RCC M15(1:2:4) with cement, coarse sand and stone grit including cost of all material, labour and T&P etc.complete. |
| 10 | Providing and laying Cement concrete M20(1:1.5:3) with cement, coarse sand and stone grit including cost of all material, labour and T&P etc.complete. |
| 11 | Providing and laying Cement concrete M25 (1:1:2) in wearing coat with cement , coarse sand, and stone grit 11.2mm including cost of all material, labour and T&P etc.complete. |
| 12 | Brick on edge soiling on Ramp |
| 13 | S/F 75mm dia PVC drainage pipe |
| 14 | S/F of year mark marble plate size 300x300x25mm |
| 15 | Supply & Fixing of Wheel Gard size 750x200x200 mm with Front Side Fluorescent Paint |
| 16 | Finishing wall with water proof cement of approved make and quality new wall with two coat to give an even shade including supply of all materials,labour etc. Please Enable Macros to View BoQ information |