| 1 | HDPE Pipe Line |
| 2 | Supply of the following sizes of HDPE pipes 6 kg/cm2 confirming to latest relevant I.S.S with HDPE couplers etc complete in all respect F.O.R. destination including all taxes and insurance. (110mm PN-6) Grade-100 110 mm Dia |
| 3 | Supply of HDPE/DI Specials conforming to I.S.-4984/2016 with solvent cement suitable for above HDPE pipe F.O.R destination including all Taxes and insurance. (5.00% Of Item No.1) |
| 4 | Dismantling of following type of surface including sorting out and staking of serviceable materials of disposal of unserviceable materials up to a distance of 50 m. B.O.E. ROAD BITUMINOUS ROAD |
| 5 | C.C. ROAD |
| 6 | INTERLOCKING TILES |
| 7 | Excavation for pipe line trenches in Ordinary soil, (lime, clay or sand Including lift up to 1.5m and lead up To 50m and refilling, watering, Ramming of excavated earth in to trenches and disposal of surplus earth up to 50 m from the center of the foundation trenches. |
| 8 | Carting from the store the following sizes of HDPE pipe and specials to the site of work lowering them in to trenches and laying true to alignment and gradient including jointing, testing of pipeline and including supply of jointing material such as nut & bolts, rubber insertion, white lead etc. com plate but excluding cost of trenching and cutting of pipes etc. For making of lengths but including making joints. 110 mm dia |
| 9 | Sand filling into the trenches at top of the laid pipe supply of necessary quantity of sand from a distance not exceeding 8Km from site of work and i/c watering, dressing etc. Rate to including supply of all material, labour and T&P etc.required for proper completion of work. |
| 10 | Supply of the following sizes of Hand Wheel operated with Sluice Valves destination including all taxes and insurance. 110 mm dia |
| 11 | Carting of D/F Sluice valves of Following sizes to the site of works Lowering them into already Prepared trenches and fixing them In position including supply of Jointing materials such as bolt nut, Rubber insertion white lead complete with Excluding values and specials Required but including the testing etc. complete Excluding values and specials required but including the testing etc. complete. |
| 12 | Supply of all materials, labour T&P etc. required and construct surface box/masonry type sluice / scour valve chamber as per type design including supply and materials labour, T&P etc. complete. Surface box Type |
| 13 | Massonary Type |
| 14 | Supply of all materials, labour T&P etc. required and constructs single tap pillar type stand post as per type design. (Stand Post) |
| 15 | Provision for Large crossing of nala, raod & culverts including shiftijng of telephone cabel etc.along the alignment of pipe line including supply of C.I Tyton pipe and special and also jointing material their laying and jiointing testing etc,complite. (3.50Mtr for Nala, Road, Hole etc) |
| 16 | Provision for small crossing of nala, raod & culverts including shiftijng of telephone cabel etc.along the alignment of pipe line including supply of C.I Tyton pipe and special and also jointing material their laying and jiointing testing etc, complite. (Upto 3.50Mtr for Nala, Road, Hole etc) |
| 17 | Interconnection of existing pipe line with new pipeline of fo;llowing sizes including road dismantling and reinstatement of all type of roads including excavation, bailling out of water, cutting of pipe and making of interconnection with all specials, fittings, labour T&P etc all complete 110mm PVC to 110 mm dia HDPE |
| 18 | Reinstatement of following type of road surface including all material, labour, T&P etc Complete. B.O.E. ROAD (with 40% new briks & 60% used old briks) BITUMINOUS ROAD |
| 19 | C.C. ROAD 1:2:4 100mm thick P.C.C. over 80mm thick P.C.C. (Cement, Course sand,30mm stone grit) |
| 20 | INTERLOCKING TILES With 40% New. |
| 21 | Provision for making household connections with supply of 1 m GI pipe(15mm) above ground and average 5 mtr HDPE pipe (20mm) below ground including specials, saddle etc of suitable sie, T&P etc including excavation, laying and jointing for proper completion of work as per instruction ofEngineer Please Enable Macros to View BoQ information |