| 1 | Dismantling R.B or R.C.C work i/c stacking of material with in 60 mtrs.distance. |
| 2 | Dismantling of Bricks or stone masonry in lime or cement i/c stacking of material with in 60 mtrs. Distance. |
| 3 | Earth work in excavation of foundation in all type of soil with back filling i/c all lead and lift with all cost of material,labour and T&P. |
| 4 | Providing and laying C.C 1:2:4 (M-15) with coarse sand & stone Aggregate of size 10 to 20mm i/c all cost of material,labour & T&P. |
| 5 | Providing and laying C.C 1:1.5:3 (M-20) with coarse sand & stone Aggregate of size 10 to 20mm i/c all cost of material,labour & T&P. |
| 6 | Providing and laying R.C.C 1:1:2 (M-25) with coarse sand & stone aggregate of size 10 to 20 mm including all cost of material,labour and T&P. But excluding cost of steel reinforcement. |
| 7 | Providing and laying C.C. 1:1:2 with coarse sand & stone aggregate 10–20 mm i/c all cost of material, labour and T&P. |
| 8 | Centering and shuttering for R.C.C. work including all costs of material and T&P. |
| 9 | Steel reinforcement including cutting, bending, binding and placing of reinforcement including cost of binding wire with all cost of material, labour and T&P. |
| 10 | Supplying and laying one layer of tar felt ISI marked at the junction of wall and roof or any place i/c necessary overlap giving a cost of approved mastic paint below the tar felt i/c cost of all material, labour and T&P. |
| 11 | providing weepholes in brick masonary/stone masonary plain/ reinforced concrete abutment, wing wall, return wall with 75 mm dia pvc pipe make of kisan and equivalent extending through the full width of the structures with slope of 1(v) : 20(H) towards drawing face complete as per drawing. |
| 12 | Providing and fixing of 75 mm dia PVC pipe Drainage spout make of kissan and equivalent complete as per drawing and Technical specification as per Moeth 2705 sr no 9.20 |
| 13 | Random coarse rubble stone masonry with cement mortar 1:4 (1 cement : 4 sand) in foundation and plinth including labour and T&P etc. up to 60 M lead. |
| 14 | Supply and laying dry boulder pitching 300mm thickness with 20 to 40kg in weight i/c all cost of material,labour t&p etc.comp. |
| 15 | Grouting of boulder pitching in 1:2:4 i/c all cost of material,labour T&P etc.complete. |
| 16 | Earth work in filling for making bund and restoration of bank Lead up to 1.00 Km. & lift up to 1.5 M with ramming and dressing etc complete |
| 17 | Supplying and filling E.C bags with earth filled and placing with in 60 mtr distance for making Bundh including all cost of material, labour and T&P. |
| 18 | Readymade coloured water proof paint weather coat two coat on new surface/ old surface including one coat of primer i/c cost of materials,labour, tools & plants etc Please Enable Macros to View BoQ information |