| 1 | Earth work in excavation in foundation trenches in all sorts of soil (including mixed soil but excluding late rite and sand stone) including removing spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, leveling dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1500 mm. |
| 2 | Earth work in filling in foundation trenches or plinth with earth. in layer not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (payment to be on basis of measurement of finished quantity of work.)(a) with earth obtainedfrom excavation of foundation |
| 3 | © with carried earth arrange by the contractor within a radius of 1 km |
| 4 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to Proper level and filling joints with local sand. |
| 5 | Cement Concrete with graded stone (30 mm size) excluding shuttering1:3:6 proportion |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. |
| 7 | Reinforcement for Reinforced Concrete work in the all sorts of structures including distribution bars, stirrups, binders etc. Including supplies of rods , initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.For works in foundation, basement and upto roof of ground floor/upto 4 m. |
| 8 | Hire and labour for shuttering with centering and necessary staging upto 4 m using approved stout and thick hard wood planks ……………. Fitting, fixing & striking out after completion of works (upto roof of groung floor)25 mm to 30 mm th. Wooden shuttering as per decision & direction of Engineer-in-Charge. |
| 9 | With out staging in foundation and plinth. |
| 10 | 125 mm th. brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 11 | Supplying 1.5mm thick M.S. sheet fitted and fixed on one or bothfaces of M.S./ W.I. gate etc. with point welding at not more than150mm apart complete in all respect as per design including cost ofall labour and materials. |
| 12 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc.(B) WallWith Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m Coloured decorative |
| 13 | Plaster (to wall, floor, celling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface]With 1:4 cement morter10 mm thick plaster |
| 14 | Neat cement punning about 1.50 mm. th. in wall, dado, window, sills, floor, drain etc.NOTE : Cement 0.152 cu. M. per 100 sq. m. |
| 15 | Soak Pit with Cover ( 0.75 mm dia Soak pit with Round cover top up to 1.20m Depth. )[L.S] |
| 16 | Applying decoretive cement based paint of approved quality after preparing the surface including scraping the same throughly (plastered or concrete surface) as per manufacturer's specification.Two coats |
| 17 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.I) For structural members of specified sections weighing less than 22.5 Kg./m |
| 18 | Polythene Bib Cock / Stop Cock (HD) with metal inlet (EMCO /ATLAS or equivalent) 15 mm |
| 19 | Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer (a) 1000 litre capacity |
| 20 | Labour for hoisting plastic water storage tank.(ii) Above 1500 litre upto 5000 litre capacity. (a) Upto 1st story from G.L. |
| 21 | Labour for punching hole in plastic water storage tank upto 50 mm dia. |
| 22 | Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore.(d) For depth upto 150 metre for tube well with top enlargement of 100 mm dia.(ii) 100 mm dia. boring etc. top enlargement |
| 23 | Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).80 mm dia. |
| 24 | Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. (a) For Exposed Work (ii) CPVC Pipes Class-2,SDR-13.5 From Storage Tank to Stand Post 25 mm15mm dia. |
| 25 | 25mm dia. |
| 26 | Supplying high density polythene strainer of approved make with adapter conforming to I.S. specifications. (ii) 80 mm. dia. |
| 27 | Supplying, fitting and fixing Steel Cutter Piece upto 450 mm long with sockets. i) 80 mm dia. |
| 28 | Supplying, fitting and fixing Check Valve (vertical) G.M. tested to 21 Kg per Sq. Cm. 25 mm. dia medium quality |
| 29 | Supplying, fixing, commissioning and testing solor Photo Voltaic Module 300Wp, 40V on existing iron frame structure each 156mm Monocrystalline Silicon solar cells laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3mm tempered glass. connforming to IEC 61215(revised) specifications or equivalent National or International Standards . The power output of the module(s) under STC should be a minimum of 300 W. The operating voltage corresponding to the power output mentioned above should be 56 V. The open circuit voltage of the PV modules under STC should be at least 57.0 Volts. The terminal box IP 65 Protection level on the module should have a provision for opening for replacing module. |
| 30 | Supplying, fixing, commissioning and testing pump controller unit consisting with PCU Switching elements MOSFET Type of Charger PWM with MPPT technology Input from PV 800V max to 370V DC, 1 to 1.5HP, single Phase with protection Short circuit, Deep discharge, Input surge Voltage, over current, Battery reverse Polarity, Solar array reverse polarity Dielectric strength1.1 KV between input/output and ground with EMI protections removed. Cooling Forced with temperature sensitive fan operation Ambient temperature 50 degree Celsius (Max) Operating Humidity 95% maximum Assembly/Mounting as per normal industrial practice Finish Epoxy Power Costing' Cable Entry from rear, preferably 200 mm above ground level all system parameters shall be displayed System parameters LCD display such as battery voltage, output (load) voltage, load current etc(Kriloskar/Sukam/Exide) make |
| 31 | Suppy and Fixing round 2 core 4sqmm PVC multi core FR wire for array connecting. |
| 32 | Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:By ISI-Medium GI pipe |
| 33 | Connecting the equipment to the earth busbar incl. S&F GI wire of size bellow on wall /floor as required and making connection to the equipment with bolts, washers, cable lugs etc. as required and mending good damages.No 4 SWG GI wire |
| 34 | Providing and fixing of lightning conductor finial, made of 25 mm dia 300mm long, copper tube, having single prong at top, with 85 mm dia 3mm thick copper base plate including holes etc. complete as required. |
| 35 | Supply, Installation, tesing & lowering of 1 HP oil fill DC solar submersible pump motor set complete having suitable dischage as per yeld test of well. Submerisble cable of 30mtr 3 core 2.5 sqmm that cable (Finolex) with MOC bar chart (Kriloskar make Pump) and necessary control panel and starter as per manufacturar specifications. |
| 36 | Supply, fitting, fixing of 38mm dia column pipe having 3.04mtr length incluing supply and fixing one socket at one end (TATA-M make) |
| 37 | Supplying Fitting Fixing Water Purifier Machine to remove the Iron,Bacteria,Arsenic and other impurities from the water and also kills bacteria through a UV lamp. The enter power comes from solar energy and there is no battary storage. The solar energy is stored in the form of pure water which will be adequate for two days of backup. (Rate Finalised As per NIQ) |
| 38 | Display Board with Photography (L.S) |
| 39 | Adding GST @ 18% |
| 40 | Adding Cess @ 1 % Please Enable Macros to View BoQ information |