| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: GE (AF) MARATHAHALLI BANGALORE Name of Work: SPECIAL REPAIR TO BASKET BALL AND VOLLEY BALL COURTS (P-38) AT SDI AF UNDER GE (AF) MARATHAHALLI BANGALORE Contract No: GE (AF) / MAR / BAN / OF 2025-2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of Work Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Removal of existing artificial turf with the help of machineries, tool charge included skilled or unskilled labour charge etc complete all as specified and as directed by Engineer In charge. |
| 3 | Hacking out the existing concrete volleyball court upto 2 inches and cleaning the surface manually with broom or vaccm cleaner complete all as specified and as directed by Engineer In charge. |
| 4 | Providing and laying 100 mm thick Granular sub base Wet Mix with 20 mm size aggregate and 0 - 6 mm chippings with sand as filler and compacted with 8-10 ton static roller complete all as specified and as directed by Engineer In charge. |
| 5 | Supply and Installation of 15 mm artificial Turf for Volleyball ground:Application area : Multisports areaProduction method : Turfing (5/8 gauge)a) Yarn characteristics Yarn type : Fibril monofilament Yarn raw material : 100% PE UV/FR RESISTANT Yarn width : 1.3 mm Yarn thichness : 130 micron D/TEX : 12000 Number of flament : 6 Number of Stiches per sqm: 9500b) Turf details Primary backing : Tencate thioback D12L. 100% PP UV Resistant Primary backing weight : 270 gm/sqm Back coating : Carboxlated SBR Latex Back coating weight : 1100gm/sqm Back cover : Carboxylated SBR LatexNote- The work for artificial turfing shall be got done only through original manufacturer or his authorised dealer / applicator ie Sports surfaces Infra / Decosports Infra / Bharat Construction,Sportz Arena infra (P) Ltd , Olympic Sports, Khelo Sports infra. |
| 6 | Supply and fixing Volleyball pole and net fixed type as specified hereunder.SPECIFICATION:-(a) Aluminium uprights shall be polyester powder coated yellow.(b) Built in ne tensioner. Tensioning shall be achieved using an adjustable pull down clamp system and ratchet winch.(c) The 10 metre 2.00 mm polyethylene net supplied with heavyweight fluorescent head and side bands for twlight visibility.(d) Black rope side straps come with crimped loop ends for additional net stability.(e) The cost of Turf screw ground sockets and insertion tool shall be deemed to be included in the quoted rate against this item.Make:\\"Sportz Arena infra (P) Ltd , Olympic Sports, Khelo Sports infra\\" |
| 7 | Hacking of the existing concrete Basketball court up to 4 inches and cleaning the surface manually with broom or air vaccum cleaner. |
| 8 | Providing and laying in position and levelling the surface with vacuum dewatered flooring machine (VDF machine) 100 mm thick concrete Mix M25 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size & maintaining curing for 7 to 10 days and compacted concrete flooring including the cost of centering shuttering & finishing - All works upto plinth at any lead & lifts complete all as specified & as directed.Note- R.C.C (Green concrete shall be supplied through approved MC batching plant |
| 9 | Supply and Installation of 05 Layer Acrylic coating system complete all as specified as under.(a) Primer Layer : To improve bonding of arcylic with subfloor.(b) Arcylic resufacer layer : for filling up the surface and smoothing subfloor.(c) Resurfacer Coat : Acrylic Resurfacer blended with slica sand for filling up the Cushion surface and smoothing the subfloor.(d) Base Coat I : Acrylic base coat for providing a uniform surface texture coat.(e) Base Coat II : Acrylic base coat II for determining the traction speed of the court.(f) Top Coat : Acrylic top coat for creating a vibrant anti skid finish highly resistance to weather and ultravoilet degradation.(g) Finally Line marking : lines acrylic textured white line marking paint.Note- The work for 05 layers acrylic coating & 01 primer layer shall be got done only through original manufacturer or his authorised dealer/ applicator ie Sports surfaces Infra / Decosports Infra / Bharat Construction.Make:Sportz Arena infra (P) Ltd , Olympic Sports, Khelo Sports infra |
| 10 | Supply anf fixing FIBA Standard basketball acrylic fiber glass back board as per following specificationsSPECIFICATION:- (a) FIBA standard size 18 mm back board made of Acrylic Fiber glass board. (b) 6ft x 4ft Standrad size Board ( including basket ball rings) (c) Drilled to take rings. |
| 11 | Demolition of Cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided for, complete all as specified and directed. |
| 12 | M & L for 75 mm thick PCC 1:3:6 type C2 (using 40mm graded stone aggregate) as in plinth protection etc finished even and smooth w/o using extra cement complete. |
| 13 | Removing building materials etc. to a distance exc.1.5 Km but n.exc. 5 Km out side MoD/Unit land including loading, unloading and stacking at the destination etc. complete all as direction of Engineer-in-charge, Total in Figures 0.0 0.0 INR Zero Only Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |