|
| 1 | PART-ISite Assessment & Preparation – Detailed site survey at Dubrayapet, assessment of existing UASB system, and its civil/ structural evaluation, utility connections, and preparation of layout drawings for container placement, piping, and instrumentation. |
| 2 | Containerized MBR System Supply – Fabrication, supply, and delivery of modular MBR units including aeration tank, membrane tank, pump room, and hollow fibre membrane modules with its accessories and consumables. |
| 3 | Pumps, Aeration, and Instrumentation – Supply and installation of influent pumps, aeration blowers with diffusers, valves, flow meters, and level sensors integrated with PLC/IoT automation and IoT monitoring (OCMS). |
| 4 | Sludge Handling & Dewatering System – Supply, installation, and commissioning of sludge thickening and dewatering equipment (screw press or belt filter press), including monitoring and safe disposal provisions. |
| 5 | Civil, Piping & Electrical Works – Foundation, plinths, trenches, piping for influent, effluent, sludge, electrical cabling, control panel installation, and integration with automation system. |
| 6 | Commissioning & Performance Testing – Testing, calibration, trial runs, and performance demonstration to ensure NGT-compliant effluent and proper integration with UASB system. |
| 7 | GST @ 18% for item No. 1 to 6 |
| 8 | PART-2 – Operation and MaintenanceO&M cost for manpower and chemicals during defect liability period of 1st year |
| 9 | O&M cost for manpower and chemicals during defect liability period of 2nd year |
| 10 | Operational and maintenance cost with supply of manpower& chemicals and maintenance of all equipment in the system for Year 1 after Defect Liability Period |
| 11 | Operational and maintenance cost with supply of manpower & chemicalsand maintenance of all equipment in the system for Year 2 after Defect Liability Period |
| 12 | Operational and maintenance cost with supply of manpower & chemicals and maintenance of all equipment in the system for Year 3 after Defect Liability Period |
| 13 | Operational and maintenance cost with supply of manpower & chemicals and maintenance of all equipment in the system for Year 4 after Defect Liability Period |
| 14 | Operational and maintenance cost with supply of manpower & chemicals and maintenance of all equipment in the system for Year 5 after Defect Liability Period |
| 15 | GST @ 18% for item No.8 to 14 Please Enable Macros to View BoQ information |