| 1 | Dismentalement Charges of 22kV HT line. |
| 2 | Dismentalement charges of ST poles Three/Pole Str. (with complete accessories.) |
| 3 | Dismentalement charges of ST poles D/Pole Str. (with complete accessories.) |
| 4 | Dismentalement charges of ST poles S/Pole Str. (with complete accessories.) |
| 5 | De-sagging of ACSR conductor 6/1/3.35mm. (Removal of conductor & De stringing only) |
| 6 | ERRECTION OF 22KV H.T LINE |
| 7 | (i) Digging of pit, (ii) Drilling of holes in X-bracing set, X-arms (iii) Erection of pole, Laying and concreting of RCC muff (iv) fixing of insulator, X-arm, X-bracing set, (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming (viii) painting of pole Four/Pole str. (Complete in all respect). |
| 8 | (i) Digging of pit, (ii) Drilling of holes in X-bracing set, X-arms (iii) Erection of pole, Laying and concreting of RCC muff (iv) fixing of insulator, X-arm, X-bracing set, (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming (viii) painting of pole Three/Pole str. (Complete in all respect). |
| 9 | (i) Digging of pit, (ii) Drilling of holes in X-bracing set, X-arms (iii) Erection of pole, Laying and concreting of RCC muff (iv) fixing of insulator, X-arm, X-bracing set, (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming (viii) painting of pole D/Pole str. (Complete in all respect). |
| 10 | (i) Digging of pit, (ii) Erection of pole, Laying and concreting of RCC muff (iii) filling of pit & Ramming (iv) Drilling of holes in X-arms (v) fixing of insulator, X-arm, knee-bracing set, top clamp (vi) fixing of Barbed wire, Danger plate (vii) painting of pole S/Pole str. (Complete in all respect). |
| 11 | ERRECTION OF STAY SET |
| 12 | (i) Digging of pit (ii)fixing of stay rod (iii) Filling of pit (iv)Nozzeling & Tighting. |
| 13 | ERRECTION OF EARTHING |
| 14 | (i) Digging of pit (ii) fixing of G.I wire to the earth system, filling of pit. |
| 15 | Sagging of ACSR Conductor 6/1/3.35mm (Single wire). |
| 16 | Laying of conductor (i) stringing & sagging (ii) binding with insulator. |
| 17 | Sagging of G.I Wire for earth wire |
| 18 | Erection of 22KV GO Switch |
| 19 | C/O of RCC foundation/base for 4pole str. (in RCC 1:1:5:3 size 2.5x2.5x2.7mm) |
| 20 | MANNUAL CARRIAGE OF H.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.400 K.M. |
| 21 | Dismentalement Charges of LT line. |
| 22 | Dismentalement charges of ST poles 8/9Mtr. (with complete accessories.) |
| 23 | De-sagging of ACSR conductor 6/1/3.35mm. (Removal of conductor & De stringing only) |
| 24 | ERRECTION OF L.T LINE. |
| 25 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles. Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). |
| 26 | ERRECTION OF STAY SET |
| 27 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 28 | SAGGING OF ACSR CONDUCTOR 6/1/3.35mm (Single wire). |
| 29 | Laying of conductor, stringing & sagging, Binding with insulator (only). |
| 30 | MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.700K.M. |
| 31 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 32 | HT line |
| 33 | Prov. RCC Muffs (2000mm) with concrete filling. |
| 34 | Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (3500) mm. |
| 35 | Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (2800) mm. |
| 36 | Prov. Cross Arm: [Channel Iron (100x50x6 mm),Length (1800) mm. |
| 37 | Prov. 22kV Pin Insulators with GI Pin (Porcelain,36kV, 10KN) |
| 38 | Prov. Disc Insulator Set (including Dead end clamp,Ballcleaves eye sockets, straight stapple & Bend Stapple etc.) Inluding Dead End Clamps etc.) |
| 39 | X-Bracing set MS Angle Iron : (50*50*6) length (2125mm)*2No. |
| 40 | Belt Set-MS Angle Iron:65X65X6, Length: (1800mm)*2Nos. |
| 41 | Prov. stay Wire (7/3.15mm) |
| 42 | Prov. Nuts & bolts. (off soze) |
| 43 | Prov. Aluminium paint. |
| 44 | Prov. Top clamp |
| 45 | Prov. MS Angle Iron (50x50x6mm), Length 2x750 |
| 46 | Prov. support clamp |
| 47 | Prov. Egg Insulator. |
| 48 | Prov. Stay Set HT (i/c stay clamp) |
| 49 | Prov. Earthing set HT |
| 50 | Prov. GI wire (8SWG) for earth wire |
| 51 | Prov.GO AB Switch Unit (11KV, 400A, 25KA)Tripple pole O/D Type |
| 52 | Prov.X-Arms (Chanenel iron (75x40x6mm), length 2800mmx4Nos) for Supporting DO fuse unit and GO Switch. |
| 53 | Prov.MS Angle Iron (50x50x6mm) Length : (450mm) x 1Nos. |
| 54 | Prov.GO Switch Handle Supporting :[ Channel Iron (75x40x5mm), Length : 460mm. |
| 55 | Prov.DO Fuse Unit |
| 56 | LT line |
| 57 | Prov. RCC Muffs (2000mm) with concrete filling. |
| 58 | Prov. Aluminium paint. |
| 59 | Prov. Shackle Insulator (16KN) |
| 60 | Prov. GI wire (8SWG) for earth wire |
| 61 | Prov. D-Iron |
| 62 | Prov. Nuts & bolts. |
| 63 | Prov. LT stay set. (i/c stay clamp) |
| 64 | Prov. support clamp |
| 65 | Providing Egg Insulator. |
| 66 | Prov. stay Wire (7/3.15mm) |
| 67 | Prov. AI 50x50x6mm (for bracket 3mtr. Per Bracket) |
| 68 | Prov. Half Clamp (MS flat 50x6mm) 2no. Per bracket. |
| 69 | Prov. Full Clamp (MS flat 50x6mm) 2no. Per bracket. Please Enable Macros to View BoQ information |