|
| 1 | Material Part of HT (TS No. 72/2025-26) (WBS No. D-25-1510) |
| 2 | Prov. RCC Muff with concerete filling |
| 3 | Prov. Dead End Clamps, Straight stapples, Bend Stapples & Eye socket ball cleaves etc. |
| 4 | Prov. CI X arm (100x50x6mm) length 1270mm |
| 5 | Prov. CI X arm (75x40x4.8mm) length 460mm |
| 6 | Prov. CI X arm (100x50x6mm) length 2340mm |
| 7 | Prov. CI X arm (100x50x6mm) length 2600mm |
| 8 | Prov. CI X arm (75x40x4.8mm) length 2800mm |
| 9 | Prov. AI X arm [ Angle iron (50x50x6mm), Length:2700 mm |
| 10 | Prov. AI X arm [ Angle iron (50x50x6mm), Length:1800 mm |
| 11 | Prov. MS AI (50x50x6mm) length 2800mm |
| 12 | Prov. AI X-Bracing Set - MS Angle Iron: 50x50x6,(2125*2) |
| 13 | Prov. AI X-Bracing Set - MS Angle Iron: 50x50x6,(1800*2) |
| 14 | Prov. AI knee bracing set 2(50x50x6mm) length 750mm |
| 15 | Prov. AI knee bracing set (50x50x6mm) length 450mm for supproting the GO switch handle |
| 16 | Prov. Stay set H.T. comp. |
| 17 | Prov. Earthing set complete |
| 18 | Prov.Full Clamps |
| 19 | Prov. Half Clamps |
| 20 | Prov.Top Clamps |
| 21 | Half clamp for holding the top clamp |
| 22 | Earth hook bolt |
| 23 | Prov. Danger plate |
| 24 | Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )] |
| 25 | Prov. Barbed wire |
| 26 | Red oxide |
| 27 | Prov. Aluminium paint |
| 28 | GO AB Switch Unit (11 KV. 400A. 25 KV ) |
| 29 | Material Part of LT (TS No. 72/2025-26) (WBS No. D-25-1510) |
| 30 | Prov. RCC Muff with concerete filling |
| 31 | MS angle iron knee bracing (65x65x6mm) length 600 |
| 32 | MS angle iron knee bracing (75x75x6mm) length 600 |
| 33 | Prov. CI X arm (100x50x6mm) length 600mm |
| 34 | Prov. Stay Set Complete (i/c stay clamp) |
| 35 | Full Clamp |
| 36 | Half clamp |
| 37 | LT Earthing set (preferbly coil earthing) |
| 38 | Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )] |
| 39 | Prov. Red oxide |
| 40 | Prov. Aluminium Paint |
| 41 | Prov. AB cable (4X70+1X70+1X16mm² ) Cables) |
| 42 | AB cable suspension Assembly |
| 43 | Anchoring Assembly |
| 44 | Façade Hook |
| 45 | Material Part of 250KVA S/stn (TS No. 72/2025-26)(WBS No. D-25-1510) |
| 46 | Muff with concerete filling |
| 47 | X-arm [ Chhanel iron (100x50x6mm), Length:2800 mm X 2 Nos] |
| 48 | M S Angle Iron.(50x50x6mm) Length 2800 mmx(1 No) For LA |
| 49 | X-arm [ Chhanel iron (75x40x6mm), Length:2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 50 | X-arm [ Chhanel iron (100x50x6mm), Length:460 mm X 2 Nos for supporting Main Channel of Transformer] |
| 51 | M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos |
| 52 | M S Angle Iron (35x35x6mm)Length 460mm x 2 Nos |
| 53 | M S Angle Iron (50x50x6mm) Length 950 mm x 2 Nos |
| 54 | Prov. M S A.I (50X50x 6 mm), Length: 2800 mm X 2 Nos. |
| 55 | Prov. M S A.I (50X50x 6 mm), Length: 450 mm X 1 Nos. |
| 56 | Prov. M S A.I (75X40x 6 mm), Length: 460mm X 1 Nos. for GO Switch |
| 57 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 58 | D.O Fuse Unit |
| 59 | Prov. Pipe Earthing set (With G.I. Strips 50x5mm,40x5mmx 25x5mm) |
| 60 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 61 | Prov. Full Clamp |
| 62 | Prov. Half Clamp with Nuts & Bolts (M.S. Flat Iron 50X6 mm) |
| 63 | Prov. Nuts and Bolts of Various Sizes Galvanised / Coated) (Prefeably 16 mm ɸ or more with flat and Spring Washers) |
| 64 | Prov. Alluminium Thimble |
| 65 | Prov. Copper Thimble |
| 66 | Prov. Red Oxccide Primer |
| 67 | Prov. Aluminium Paint. |
| 68 | Prov. Danger Plate |
| 69 | Transformer Bed (Civil work) |
| 70 | Chain Link Fancing, Angle Iron, Gate etc for Transformer fancing |
| 71 | Erection Part of HT (TS No. 72/2025-26) (WBS No. D-25-1510) |
| 72 | Erection of ST pole 11/9 mtrs , muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 1500*100*50mm for Single pole structure , drilling of holes in pole , pin insulator with pin, knee bracing set, barbed wire, danger plate, MS full clamps,top clamp, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect. |
| 73 | Erection of ST pole 11/9 mtrs , muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 1500*100*50mm for double pole structure , drilling of holes in pole, pin insulator with pin, knee bracing set, barbed wire, danger plate, MS full clamps,top clamp, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect. |
| 74 | Erection of HT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect. |
| 75 | Erection of HT stay set, stay wire, stay clamp, egg insulator, digging of pit, filling and ramming, fixing of stay rod, nozzeling and tightening etc. complete in all respect. |
| 76 | Erection AAAC 7/3.81 (80mm2) i/c laying, stringing, sagging, binding with insulators and jumpering etc. complete in all respect. |
| 77 | Laying of G.I. Wire 6/8SWG i/c stringing, sagging and binding with earth hook bolt for continous earth wire complete in all respect. |
| 78 | Erection of GO Switch complete in all respect. |
| 79 | Fixing of jumpers |
| 80 | Manual carriage for above material (Av. Lead 0.050Km.) |
| 81 | Erection Part of LT (TS No. 72/2025-26) (WBS No. D-25-1510) |
| 82 | Erection of LT steel poles 8/9 Mtrs long, shackle insulator with D-iron eye hook, digging of pole pit size 1.20x0.80x1.35 filling and ramming and painting etc complete in all respect |
| 83 | Erection of LT stay set, stay clamp, egg insulator, stay wire, stay thimble, nozzeling and tightening, digging of stay pit size 1.20*.80*.1.50 mtr, filling and ramming of pit complete in all respect |
| 84 | Laying of AB Cable LT (4X70+1X70+1X16mm² ) x 2 Cables)i/c stringing, sagging, binding with insulators and jumpering etc. complete in all respect. |
| 85 | Manual carriage for above material (Av. Lead 0.050Km.) (For 3-Ph Line) |
| 86 | Erection Part of 250KVA S/stn (TS No. 72/2025-26)(WBS No. D-25-1510) |
| 87 | Erection of 250 KV 11/0.4 KV Transformer , LT Penal Box, Energy meter ,LT Cable including loading and unloading Transformer and carriage of dismentelled 100 KVA transformer from site of work to section Store complete in all respect |
| 88 | Manual carriage for above material (Av. Lead 0.050 Km.) Please Enable Macros to View BoQ information |