|
| 1 | Providing and fixing double flanged swing check type cast steel reflux valve of following dia of Kirloskar / Leader make to conforming to BS: 1868/API-600 Class ASA-150 including M.5. flanges table-5 as per 15 6392-1971 including weiding of flanges and capable of with standing of 21.00 Kg/cm²³ seat pressure with upto date amendments including carriage within all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. |
| 2 | 50 mm |
| 3 | 65 mm |
| 4 | Providing and fixing double flanged cast steel Sluice valve of following dia of Kirloskar Leader make to conforming to BS: 1414/API-600 Class ASA-150 including M.S. flanges as per IS 6392-1971 Table-5 including welding of flanges and capable of with standing of 52.00 Kg/cm² seat pressure with upto date amendments including carriage within all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. |
| 5 | 50 mm |
| 6 | Providing and fixing of 3 core copper cable of 10 mm² of Havels/Finolex make within all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. |
| 7 | Providing & fixing of Multimeter/Voltmeter of Schneider Electric Make within all lead and lifts |
| 8 | Repair of Pumping Machinery 15KW/20 HP, RKB32/14H-10 |
| 9 | Repair of pump shaft EN-9 steel complete in all respect as per direction of Engineer-in-charge. |
| 10 | Providing and fixing of stage ring C.I. complete in all respect as per direction of Engineer-in-charge. |
| 11 | Providing and fixing of distance bush complete in all respect as per direction of Engineer-in-charge. |
| 12 | Providing and fixing of diffuser ring C.I. complete in all respect as per direction of Engineer-in-charge. |
| 13 | Providing and fixing of gland sleaves in MS complete in all respect as per direction of Engineer-in-charge. |
| 14 | Providing and fixing of Imepller in GM complete in all respect as per direction of Engineer-in-charge. |
| 15 | Providing and fixing of bearing house C.I complete in all respect as per direction of Engineer-in-charge. |
| 16 | Providing and fixing of bearing 63092 R 5 make complete in all respect as per direction of Engineer-in-charge. |
| 17 | Providing and fixing of bearing brackt stud EN-9 make complete in all respect as per direction of Engineer-in-charge. |
| 18 | Providing & fixing nut & bolts complete in all respect within all leads and lifts as per direction and to the satisfaction of Engineer-in-Charge. |
| 19 | Providing & fixing of O Ring complete in all respect within all leads and lifts as per direction and to the satisfaction of Engineer-in-Charge. |
| 20 | Providing and fixing of water seal complete in all respect as per direction of Engineer-in-charge. |
| 21 | Repair of pump shaft EN-9 steel complete in all respect as per direction of Engineer-in-charge. |
| 22 | Providing & fixing of check net complete in all respect as per direction of Engineer-in-charge. |
| 23 | Providing & fixing of Gland dori complete in all respect within all leads and lifts as per direction and to the satisfaction of Engineer-in-Charge. |
| 24 | Providing & fixing of diffuser and CI weldinh and turning complete in all respect within all leads and lifts as per direction and to the satisfaction of Engineer-in-Charge. |
| 25 | Repair of impeller by gas welding and tuning complete in all respect as per direction of Engineer-in-charge. |
| 26 | Carriage of Pump set from site of work to work shop & Back to site including fitting and testing at site complete. |
| 27 | Welding work of common headerand repair of rining main at different RDs. complete in all respect within all leads and lifts as per direction and to the satisfaction of Engineer-in-Charge. |
| 28 | Repair of Starter 20 HP |
| 29 | Providing and fixing of contact movable Drum base complete in all respect as per direction of Engineer-in-charge. |
| 30 | Providing and fixing of contact fix type center complete in all respect as per direction of Engineer-in-charge. |
| 31 | Providing and fixing of contact fix type star delta complete in all respect as per direction of Engineer-in-charge. |
| 32 | Providing and fixing of movable contact set (Complete set in copper) complete in all respect as per direction of Engineer-in-charge. |
| 33 | Providing and fixing of over load coil complete in all respect as per direction of Engineer-in-charge. |
| 34 | Providing and fixing of copper thimble 250Amp complete in all respect as per direction of Engineer-in-charge. |
| 35 | Providing and fixing of no volt coil within all lead and lift complete in all respect as per direction of Engineer-in-charge. |
| 36 | Carriage of Starter from site of work to work shop & Back to site of work complete in all respect as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |