| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m.Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket.capacity .including cutting and loading in tippers, trimming bottom and side slopes, in .accordance with requirements of lines, grades and cross-sections, and transporting .to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per .Technical Specification Clause 302.3 |
| 2 | Providing concrete for plain/ reinforced concrete in open foundations complete as per,drawings and technical specifications Clause 802, 803, 1202 & 1203 M10 (1: 3: 6) hand mix |
| 3 | Stone masonry in cement mortar for substructure complete as per drawing & technical.specification Clauses 702, 704, 1202 and 120R.R. STONE MASONRY IN 1:5 CM , |
| 4 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,etc. including supply of all material, labour, T&P and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203 of MORD Specifiction |
| 5 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment,wing wall, return wall with 100 mm dia AC pipe extending through the full width of the.structures with slope of 1(V):20(H) towards drawing face complete as per drawing and.technical specification Clauses 614, 709, |
| 6 | Hand Packed stone filling in back of wallls including cost of all materials, royality,T&P etc. complete as per direction of Engineer-in- charge. (As per PWDUttarakhand specifications) |
| 7 | Pointing With Cement Mortar 1:3 , Including cost of all materials, labour and T&P ETC. requiredfor proper comletionof work . |
| 8 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire.conforming to IS:280&IS:4826 in 150mmx150mm mesh laid with stone,boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) 08 GAUGE |
| 9 | Seeding and Mulching (Preparation of seed bed on previously laid top soil ,furnishing and placing of seeds, fertilizer ,mulching material,applying bituminous emlusion at the rate of 0.23 litres per sqm and laying and fixing jute netting , including watering for 3 months all as per clause 308) Pointing with cement mortar (1:3) as per drawing and technical specification Clauses 613.3 and 1204 Please Enable Macros to View BoQ information |