| 1 | Labour for site clearance |
| 2 | E/W in excavation in foundation trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50m including all lifts,levelling,ramming,the foundation trenches,removing roots of trees and extra for earthwaork in hard soil(vide classification of soil item B)...do.....do.....E/I |
| 3 | Providing coarse clean sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick all….do….do…E/ |
| 4 | Construction of granular sub base by providing close graded material |
| 5 | Providing designation 75A one brick flat soling and joint filled with local sand including cost of watering taxes royalty all…do…do…E/I |
| 6 | Providing P.C.C. M-150 with nominal mix of (1:2:4) in foundation and plinth with approved quality of stonechips 20mm to 6mm size graded and clean coarse sand of FM 2.5 to 3 all…do…do…E/I |
| 7 | Providing and laying in position C.C. of grade M-200 with nominal mix of (1:1.5:3) in foundation all….do…do…E/I |
| 8 | Providing and laying in position C.C. of grade M-200 with nominal mix of (1:1.5:3) in foundation all….do…do…E/I |
| 9 | Providingrandamrubblestonemasonryin CM (1:4) in foundation and plinthwith hammerdressedstoneof lessthan0.03 M3 involumeandcleancoarsesandof F.M.2to2.5 includingcostofscreening rakingout jointsto20mmdepth,curing taxes and royalty all complete as per building specification and direction of E/I. |
| 10 | Providingrandamrubblestonemasonryin CM(1:4) insuperstructureincludingcost of screening of materials scaffolding rakingout jointsto20mmdepth,curing taxes and royalty all complete as per building specification and direction of E/I |
| 11 | Providing designation 75A brick work in C.M (1: 6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I. |
| 12 | Providing designation 75 b brick work in C.M. (1: 4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 13 | Providing 12mm. cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 14 | Providing 1.5mm. cement punning including curing, carriage of water withall leads and lifts as per building specification and direction of E/Л. |
| 15 | Earth filling in foundaion trenches and plinthinlayersnotexceding150mmthick wellwatered, rammed, fullycompacted and fine dressed with earth obtained fromexcavationof foundation trenches withinaleadof50Mandliftof1.5Mall complete as per building specification and direction of E/I. (mode of measurement compacted volume) |
| 16 | Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper scaffolding , curing and taxes all complete as per building specification and direction of E/I |
| 17 | Add carraige cost of materials i) Sand |
| 18 | chips lead 12 km |
| 19 | Bricks lead 11 km |
| 20 | steel + cement 5 km |
| 21 | Centering and shuttering including strutting, propping etc. and removal of form for tie beam |
| 22 | Add 18 % GST |
| 23 | add 1 % labour cess Please Enable Macros to View BoQ information |