| 1 | Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer-in charge. |
| 2 | Construction of coolie walling including supply of all material, labour, T&P etc.required for proper completion of the work as per direction of Engineer-in- charge.(As per PWD Uttarakhand specifications) |
| 3 | Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge |
| 4 | Random Rubble stone masonary laid in 1:6 cement and send mortar,in breast wall,retaining walls,parapets,scuppers,etc, including supply of all material labour, T&P & royalties etc. required for proper completion of the work |
| 5 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction |
| 6 | H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. |
| 7 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3.6 (Hand mixing) |
| 8 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 20 |
| 9 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 |
| 10 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 |
| 11 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 &1202 |
| 12 | S/F 150 mm dia 5.40 mm thick I.S.I Mark M.S. Pipe both side Flanged including cost of washer nut bolt, Labour etc complete at Trisula village And Sem Sankri Village Please Enable Macros to View BoQ information |