|
| 1 | Ns item is not sanctioned in estimate therefore please do not enter any rate for it. |
| 2 | [10.77]Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 60mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate] |
| 3 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 4 | [13.6.1]Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. 1. Using M.S. angels 40x40x6 mm for diagonal braces [Through Rate] |
| 5 | [2.B0017] B0017. Stone Aggregate (Single size) : 40 mm nominal size [Rate] |
| 6 | [20.114.3]Supplying erection, testing of fullyautomatic electric control panel board forT/Wells in Pump Chamber consisting ofMS sheet of thickness 14 gauge dulypainted box type floor mounted made ofangle Frame containing 1 no. fullyautomatic air brake starter suitable forMotor of the following capacity, Minswitch of suitable range with HRC fuse, 1no. volt meter (0 to 500 volts), 1 No.Amp. Meter of 0 to 100 amp. 3 sets ofindicating lamp capacitor of suitablecapacity and 1 no. single phase preventerswith the timer switch including wiring inpanel board and suitable electric energymeter wiring in Electric Control PanelBoard complete in all respect as perspecification given in Schedule No. II,Including MCB, suitable, Capacitor,Wooden Box etc as per siterequirement complete in all respect. 3. 20 HP Motor [Through Rate] |
| 7 | [20.73.4]Supply and fixing of Gantry with chainpulley block (tested for 1.5 times the ratedcapacity) with travelling trolley ofappropriate lifting capacity as per IS code3177:1999 with up to date amendments forhandling of pumping sets capable ofmoving along the girders including cost ofsuitable sized RCC pillars to be provided inpump house complete in all respects as perdirections of Engineer-in-charge 4. 2.5 tonne capacity [Through Rate] |
| 8 | [21.104.55]Supplying, erection, testing andcommissioning of submersible motorpumping set non clog for seweragehaving head 10.00 m as per the indicatedrequirements of discharge in LPM andpower capacity in BHP as per IS markedincluding all accessories (like SS Pipes,SS Chain (Shackle Chain) ,SS FoundationBolt, complete base frame, Monorail,Chain Guide Line, Auto Compiling, DuctFoot Bend (D/F Bend) etc. complete in allrespect 55. Discharge Capacity (LPM) - 4600Power Capacity (BHP) - 17.5 [through rate] |
| 9 | [21.95.3]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 3. 450 mm [Through Rate] |
| 10 | [3.1.6]By Mechanical Transport including loading, unloading and stacking 6. Stone aggregate 40 mm nominal size and above [5km] |
| 11 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 12 | [6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 13 | [6.1.5]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 5. 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) [Through Rate] |
| 14 | [6.23.1.1]Providing and laying in position ready mixed plain cement concrete, using fly ash and cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 1.1. All works up to plinth level M-15 grade plain cement concrete (cement content considered @ 240 kg/cum) [Through Rate] |
| 15 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level [Through Rate] |
| 16 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate] |
| 17 | [6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Through Rate] |
| 18 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] |
| 19 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] |
| 20 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] |
| 21 | [7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] |
| 22 | [7.35]Tile brick masonry work 5 cm thick with common burnt clay non-modular tile bricks of class designation 10 in cement mortar 1:3 (1 cement : 3 coarse sand) in superstructure above plinth and up to floor four level. [Through Rate] Please Enable Macros to View BoQ information |