|
| 1 | DRINKING WATER SUPPLY |
| 2 | OD494720/2025-2026:100.47.2.3 Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line includingdetecting and locating leak, earth work excavation in all kinds of soil for for exposingleak portion of the pipe including tar cutting / concrete cutting, cutting the pipediametrically perpendicular to the axis of pipe line with out causing any damages tothe balance portion, dismantling and lifting the pipe from trenches, smoothening thecut ends, conveying the new pipe, cutting and lowering new pipe in to thetrenches,placing in position aligning the pipe to line and level and jointing the newpipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed andrefilling the trenches in layers not exceeding 20cm depth including consolidating eachlayers by ramming, watering, charges for removing surplus soil from work site withoutcausing any damages to the existing utilities, including hire for tools and plant,conveyance of tools and materials, bailing out water, providing cautionboards,lighting, ribbon fencing, watching, traffic control etc.complete as per thedirection of Departmental officers, including the cost of pipe & specials butexcluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality andconforming to relevant standards: Socket & CIR Jointing. |
| 3 | OD494746/2025-2026:100.47.1.4 Leak rectification work in 63 mm PVC (Class 2 to 6) pipe line includingdetecting and locating leak, earth work excavation in all kinds of soil for for exposingleak portion of the pipe including tar cutting / concrete cutting, cutting the pipediametrically perpendicular to the axis of pipe line with out causing any damages tothe remaining portion, dismantling and lifting the pipe from trenches, smoothening thecut ends, conveying the new pipe to the site, cutting and lowering new pipe in to thetrenches,placing in position aligning the pipe to line and level and jointing the newpipe with the existing pipe with solvent cement or or any available joint and testing thepipe line by operating the valves concerned, and rectifying the defects if noticed andwithout causing any damages to the existing utilities and refilling the trenches usingexcavated earth in layers not exceeding 20cm depth including consolidating eachlayers by ramming, watering, charges for removing surplus soil from work site,including hire for tools and plant, conveyance of tools and materials, bailing out water,providing caution boards,lighting,watching, ribbon fencing, traffic controllingetc.complete as per the direction of Departmental officers including the cost of pipeand PVC specials; PVC Pipes and specials shall be of good quality and conforming torelevant standards: All Socketed Jointing. |
| 4 | OD494747/2025-2026:100.47.2.2 Leak rectification work in 110 mm PVC (Class 2 to 6) pipe line includingdetecting and locating leak, earth work excavation in all kinds of soil for for exposingleak portion of the pipe including tar cutting / concrete cutting, cutting the pipediametrically perpendicular to the axis of pipe line with out causing any damages tothe balance portion, dismantling and lifting the pipe from trenches, smoothening thecut ends, conveying the new pipe, cutting and lowering new pipe in to thetrenches,placing in position aligning the pipe to line and level and jointing the newpipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed andrefilling the trenches in layers not exceeding 20cm depth including consolidating eachlayers by ramming, watering, charges for removing surplus soil from work site withoutcausing any damages to the existing utilities, including hire for tools and plant,conveyance of tools and materials, bailing out water, providing cautionboards,lighting, ribbon fencing, watching, traffic control etc.complete as per thedirection of Departmental officers, including the cost of pipe & specials butexcluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality andconforming to relevant standards: Socket & CIR Jointing.Leak rectification work in 110 mm PVC |
| 5 | OD494748/2025-2026:100.47.2.1 Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line includingdetecting and locating leak, earth work excavation in all kinds of soil for for exposingleak portion of the pipe including tar cutting / concrete cutting, cutting the pipediametrically perpendicular to the axis of pipe line with out causing any damages tothe balance portion, dismantling and lifting the pipe from trenches, smoothening thecut ends, conveying the new pipe, cutting and lowering new pipe in to thetrenches,placing in position aligning the pipe to line and level and jointing the newpipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed andrefilling the trenches in layers not exceeding 20cm depth including consolidating eachlayers by ramming, watering, charges for removing surplus soil from work site withoutcausing any damages to the existing utilities, including hire for tools and plant,conveyance of tools and materials, bailing out water, providing cautionboards,lighting, ribbon fencing, watching, traffic control etc.complete as per thedirection of Departmental officers, including the cost of pipe & specials butexcluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality andconforming to relevant standards: Socket & CIR Jointing. |
| 6 | OD494749/2025-2026:100.47.1.3 Leak rectification work in 50 mm PVC (Class 2 to 6) pipe line includingdetecting and locating leak, earth work excavation in all kinds of soil for for exposingleak portion of the pipe including tar cutting / concrete cutting, cutting the pipediametrically perpendicular to the axis of pipe line with out causing any damages tothe remaining portion, dismantling and lifting the pipe from trenches, smoothening thecut ends, conveying the new pipe to the site, cutting and lowering new pipe in to thetrenches,placing in position aligning the pipe to line and level and jointing the newpipe with the existing pipe with solvent cement or or any available joint and testing thepipe line by operating the valves concerned, and rectifying the defects if noticed andwithout causing any damages to the existing utilities and refilling the trenches usingexcavated earth in layers not exceeding 20cm depth including consolidating eachlayers by ramming, watering, charges for removing surplus soil from work site,including hire for tools and plant, conveyance of tools and materials, bailing out water,providing caution boards,lighting,watching, ribbon fencing, traffic controllingetc.complete as per the direction of Departmental officers including the cost of pipeand PVC specials; PVC Pipes and specials shall be of good quality and conforming torelevant standards: All Socketed Jointing. |
| 7 | OD494767/2025-2026:100.47.1.5 Leak rectification work in 75 mm PVC (Class 2 to 6) pipe line includingdetecting and locating leak, earth work excavation in all kinds of soil for for exposingleak portion of the pipe including tar cutting / concrete cutting, cutting the pipediametrically perpendicular to the axis of pipe line with out causing any damages tothe remaining portion, dismantling and lifting the pipe from trenches, smoothening thecut ends, conveying the new pipe to the site, cutting and lowering new pipe in to thetrenches,placing in position aligning the pipe to line and level and jointing the newpipe with the existing pipe with solvent cement or or any available joint and testing thepipe line by operating the valves concerned, and rectifying the defects if noticed andwithout causing any damages to the existing utilities and refilling the trenches usingexcavated earth in layers not exceeding 20cm depth including consolidating eachlayers by ramming, watering, charges for removing surplus soil from work site,including hire for tools and plant, conveyance of tools and materials, bailing out water,providing caution boards,lighting,watching, ribbon fencing, traffic controllingetc.complete as per the direction of Departmental officers including the cost of pipeand PVC specials; PVC Pipes and specials shall be of good quality and conforming torelevant standards; PVC Pipes and specials shall be of good quality and conforming torelevant standards: All Socketed Jointing. |
| 8 | OD494771/2025-2026:00.47.1.2 Leak rectification work in 40 mm PVC (Class 2 to 6) pipe line includingdetecting and locating leak, earth work excavation in all kinds of soil for for exposingleak portion of the pipe including tar cutting / concrete cutting, cutting the pipediametrically perpendicular to the axis of pipe line with out causing any damages tothe remaining portion, dismantling and lifting the pipe from trenches, smoothening thecut ends, conveying the new pipe to the site, cutting and lowering new pipe in to thetrenches,placing in position aligning the pipe to line and level and jointing the newpipe with the existing pipe with solvent cement or or any available joint and testing thepipe line by operating the valves concerned, and rectifying the defects if noticed andwithout causing any damages to the existing utilities and refilling the trenches usingexcavated earth in layers not exceeding 20cm depth including consolidating eachlayers by ramming, watering, charges for removing surplus soil from work site,including hire for tools and plant, conveyance of tools and materials, bailing out water,providing caution boards,lighting,watching, ribbon fencing, traffic controllingetc.complete as per the direction of Departmental officers including the cost of pipeand PVC specials; PVC Pipes and specials shall be of good quality and conforming torelevant standards: All Socketed Jointing |
| 9 | OD494781/2025-2026:00.47.2.4 Leak rectification work in 160 mm PVC (Class 2 to 6) pipe line includingdetecting and locating leak, earth work excavation in all kinds of soil for for exposingleak portion of the pipe including tar cutting / concrete cutting, cutting the pipediametrically perpendicular to the axis of pipe line with out causing any damages tothe balance portion, dismantling and lifting the pipe from trenches, smoothening thecut ends, conveying the new pipe, cutting and lowering new pipe in to thetrenches,placing in position aligning the pipe to line and level and jointing the newpipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed andrefilling the trenches in layers not exceeding 20cm depth including consolidating eachlayers by ramming, watering, charges for removing surplus soil from work site withoutcausing any damages to the existing utilities, including hire for tools and plant,conveyance of tools and materials, bailing out water, providing cautionboards,lighting, ribbon fencing, watching, traffic control etc.complete as per thedirection of Departmental officers, including the cost of pipe & specials butexcluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality andconforming to relevant standards: Socket & CIR Jointing. |
| 10 | 50.18.9.7.1:Providing and fixing PVC pipes includings of pipes with one step PVC solvent cement, trenching refilling & testing of joints complete as per direction of Engineer in Charge. 63 mm dia 6Kgf/cm2 |
| 11 | 18.12.6:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work50 mm dia nominal bore |
| 12 | 50.18.9.2.2:Providing and fixing PVC pipes includings of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 20 mm dia 10 Kgf/cm2 |
| 13 | 50.18.9.3.2:Providing and fixing PVC pipes includes jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 25 mm dia 10KGF/cm2 |
| 14 | 50.18.9.4.2:Providing and fixing PVC pipes includings joints of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 32 mm dia 6 Kgf/cm2 |
| 15 | 50.18.9.5.2:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints compete as per direction of Engineer in Charge. 40 mm dia 6 Kgf/cm2 |
| 16 | 50.18.9.6.2:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 50 mm dia 6 Kgf/cm2 |
| 17 | 50.18.9.8.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 75 mm dia 6 Kgf/ cm2 |
| 18 | OD510279/2025-2026:PVC pipe 110 mm outer dia 8kgf/cm2 Add 5% for wastage etc.on (A) |
| 19 | 18.19.2.1:Providing and fixing gun metal non-return valve of approved quality (screwed end):32 mm nominal boreHorizontal |
| 20 | OD510065/2025-2026:providing and fixing gun metal gate valve with G.I wheel of approved( screwed end)100mmnominal bore |
| 21 | 18.12.4:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work32 mm dia nominal bore |
| 22 | 18.12.5:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work40 mm dia nominal bore |
| 23 | 18.17.2:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :32 mm nominal bore |
| 24 | 18.17.3:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :40 mm nominal bore |
| 25 | 18.17.4:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :50 mm nominal bore |
| 26 | 18.17.6:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :80 mm nominal bore |
| 27 | 18.54.1:Providing and fixing PTMT bib cock of approved quality and colour.15 mm nominal bore, 86 mm long, weighing not less than 88 gms Please Enable Macros to View BoQ information |