| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:2.9.1 All kinds of soil : |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected:ALL KIND OF SOIL |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:4.4.8 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20 percent plum |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shutteringand finishing with.4.5.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20 percent plum |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth:without bond stone |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:4.6.1 Foundations, footings, bases for columns |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.2 Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. |
| 9 | dumping stone including cost of stone in horizontal level including cost of stone |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 11 | Hand packed stone filling in wire crates incl. cost of stone and wire crates size6.00 m x 1.20 x 1.20 G.I. wire crates having wire diameter 4 mm with mesh spacing 100 mm x 100mm mechanically woven diagonally. |
| 12 | carriage of sand an avg distance 70km MT |
| 13 | carriage of stone agg below 40mm avg distance 5km MT |
| 14 | carriage of stone agg above 40 mm avg distance 5km MT |
| 15 | carriage of stone avg distance 2km MT Please Enable Macros to View BoQ information |