| 1 | Earth work in excavation of foundation in hard soil or gravelly soil including rough dressing, leveling the foundation bed and laying the excavated earth in layers not exceeding 0.30m depth in the specified filling sections, rough dressing and breaking clods to maximum 5 cm to 7 cm and disposing the excess earth away from work site with cost of all labour, T&P and workers welfare cess etc. complete and as per the direction of the Engineer-in-charge. |
| 2 | Spreading, watering & ramming sand (for filling) of approved quality on finished approved surface in structural bed portion including cost, carriage, royalty & taxes of sand with all leads, lifts,delifts construction & removal of coffer dam & dewatering if required with all other incidental charges etc. complete as per the direction of the Engineer-in- charge. |
| 3 | Cement concrete M15 grade with crushed granite coarse aggregate of size 40mm down graded free from weathered skin surface, dust and any other deleterios materials including cost, carriage, royalty taxes etc. of all materials including machine mixing, watering compacting with vibrator, curing with all leads, lifts and delifts including hire and running charges of machineries, construction & dewatering if required with all other incidental charges etc. complete as per specification drawing and direction of the Engineer-in-Charge. |
| 4 | Cement concrete M15 grade with crushed granite coarse aggregate of size 20mm down graded free from weathered skin surface, dust and any other deleterios materials including cost, carriage, royalty taxes etc. of all materials including machine mixing, watering compacting with vibrator, curing with all leads, lifts and delifts including hire and running charges of machineries, construction & dewatering if required with all other incidental charges etc. complete as per specification drawing and direction of the Engineer-in-Charge. |
| 5 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete. |
| 6 | Filling foundation and plinth with selected excavated materials with watering compaction to desired density with all leads, lifts, delifts, construction & removal of coffer dam & dewatering if required with all other incidental charges etc. complete as per specification and direction of Engineer-in-Charge. |
| 7 | Collecting, supplying & stacking at work site & conveying from stacks and dry stone masonary or rough stone dry masonary with hard stone of 30 cm & above size with wedging, hammering & filling the interstices with small spalls including cost, carriage, royality all taxes of materials, workers welfare cess etc complete as per direction of the Engineer-in-charge. |
| 8 | Quarrying, Collecting, supplying & stacking of hard granite stone boulder of at least 30 cm and above in length in any direction from approved quarry free from wether skin surface and other deleterious materials and packing the stones in rip-raps, spur, and slope protection works in river embankments to required profile in all heights and depths including filling the interstices with small stones wedging and hammering and packing surface to proper line and levels including fixing wave breakers etc complete with all cost of incidental charges including cost, carriage & royality of all materials, including all labour, T&P etc complete and labour cess taxes as applicable as per drawing, specification, direction of Engineer-in-charge. Please Enable Macros to View BoQ information |