| 1 | Earth work in bulk excavation by manual means in trenches for foundations drains pipes, cables etc. not exceeding 1.5 mtrs in width and for shafts, wells, cesspits and the like not exceeding the 10 sq mtr on plan incliding dressing of sites and ramming of bottoms lift upto 1.5, mtrs including getting out excavated earth and dsposal of surplus excavated earth as directed. All kinds of soils 1mtr from cutting edge. |
| 2 | Dismantling of old protection work including cutting of crates & stacking of stones. |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 4 | Supply of stone boulders(nallah)nominal size 225 mm (Stack measurements reduced by 15%) |
| 5 | Dumping stones excluding cost of stones in horizontal on level. |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. all work upto plinth level with 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) |
| 7 | Centering and shuttering including strutting propping etc. and removal of form work for.A) Foundation, footing, bases of columns. |
| 8 | Centering and shuttering including strutting propping etc. and removal of form work for.A) B) Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets etc. |
| 9 | Carriage of stones by head load from local nallah to site of work (Extra carriage shall be paid only after verification by the concerned site engineer) AEE. i. 1st 50 mtr |
| 10 | Carriage of stones by head load from local nallah to site of work (Extra carriage shall be paid only after verification by the concerned site engineer) AEE. i. Next 50 mtr |
| 11 | Providing BA wire Knitted crates of size 6 x 1.5 x 1.5 mtr with required binding wire including cost of binding wire and carriage upto site of work |
| 12 | Filling empty cement bags with sand /earth including cost of sewing and strings; excluding the cost of bags and earth/sand. |
| 13 | Unloading/ Placing filled EC bags in position B. Placing in Dry |
| 14 | Unloading/ Placing filled EC bags in position B. H. Placing in water |
| 15 | Supply of stone dust for filling of E.C bags |
| 16 | Supply of E.C bags |
| 17 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 18 | Slip Clearance In soils, mixed with moorum/Kankar/ Shingle/boulders, disposal lead upto 50m and lift 1.5m. A) By Manual means. |
| 19 | Slip Clearance In soils, mixed with moorum/Kankar/ Shingle/boulders, disposal lead upto 50m and lift 1.5m. A) By Mechanical means. |
| 20 | Disposal of silt/slip by Head Load.a) 1st 50 mtr. |
| 21 | Disposal of silt/slip by Head Load.a) b) Beyond 50 mtr.. |
| 22 | Carriage of Sand/stones aggregate by Mechanical transport & Head load 20 kmby Mechanical |
| 23 | Carriage of Sand/stones aggregate by Mechanical transport & Head load Extra beyond 20 kmby Mechanical |
| 24 | Carriage of Sand/stones aggregate by Mechanical transport & Head load Ist 50 mtrs |
| 25 | Carriage of Sand/stones aggregate by Mechanical transport & Head Load Extra beyond 50 mtrs |
| 26 | Engagement of extra labour (wherever required).1. Mazdoor Please Enable Macros to View BoQ information |