| 1 | Labour charges for removing and Re-fixing of a \\"W\\" metal beam Crash barrier. |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 3 | Supply and filling of Spilit Nalllah Stone s into wire crates , tipping of filled crates in position with all charges including cost of Stones and crates complete (4” x 4” mesh SWG Black Enamelled Wire) Incl. all carriages / leads & lifts, incidental and consequential costs complete (work to be executed as per relevant IS codes and as directed at site) |
| 4 | Providing and laying of Nallah muck /RBM /Boulders behind R/B walls incl. carriage of same upto site of work complete. |
| 5 | Providing and laying of Stone solling, Hand packed ,levlling ,filling of voids including all leads , lifts & carriage of same upto site of work complete. |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 7 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement , 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level (Thermo-Mechanically Treated bars of grade Fe-500D or more.) |
| 10 | 12 mm thick cement sand plaster in 1:4 mix complete job etc. |
| 11 | Centering and shuttering including strutting, propping etc. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 12 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 13 | Carriage of material from various sources to site of work by MT . Aggregate avg lead 12 Kms |
| 14 | Sand avg lead 40 Kms Please Enable Macros to View BoQ information |