| 1 | Flat Brick solingProviding and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412. |
| 2 | WBM Grading 3Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MoRD Technical Specification Clause 405.I. By Manual Means |
| 3 | Maintenance of bituminous surface roadRepair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with 75 mm B.M, after applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per MoRD technical specification Clauses 1900, 502, 503 and 504. |
| 4 | Prime CoatLow porosityProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70- 1.00 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502. |
| 5 | Tack CoatProviding and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503. |
| 6 | Tack coat using hot straight run bitumen of grade VG-30 on bituminous surfaceProviding and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: On bituminous surface @ 0.50 Kg/ Sqm. |
| 7 | 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade / modified bitumen) BinderProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508Case - II: By Mechanical MeansBitumen of VG-30 |
| 8 | Seal CoatProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510.A. By Manual Meansi) Case - IV : Type D (premix with fine sand)a) Bitumen of VG-30 |
| 9 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5 |
| 10 | Surface Drains Construction of unlined surface drains of average cross-sectional area 0.4 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per MoRD Technical Specification Clause 307.(i) Surface Drains in Ordinary Soil a) Manual Means |
| 11 | Maintenance of Earthen shoulder (Stripping of excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903. |
| 12 | Excavation for StructuresA. Without dewatering.Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.(I) Ordinary Soil (i)Upto 3 m depth |
| 13 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200(I) Sand filling |
| 14 | Providing concrete for plain concrete ( using jhama brick aggregate ) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)(I) P.C.C grade M 10( using jhama brick aggregate) (i) Nominal mix 1:3:6 |
| 15 | Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).(I) P.C.C grade M 15( using jhama brick aggregate) (i) Nominal mix 1:2.5:5 |
| 16 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in foundation complete as per drawings & MoRD technical specifications Clauses 1000 & 1202. |
| 17 | Plain cement concrete (using jhama brick aggregate) in substructure complete including formwork as per drawings & MoRD technical specification Clauses 802, 804, 805, 806, 807, 900, 1202 & 1204 (including centering, shuttering, staging etc. but excluding reinforcement)I. P.C.C grade M 15 (1:2.5:5 Nominal mix) |
| 18 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar in substructure complete as per drawings & MoRD technical specification Clauses 1002, 1005, 1010 and 1202. |
| 19 | Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return all with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 kg/cm2 pressure) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRD technical specification clauses 614, 709, 1204.3.7. |
| 20 | Providing & laying filter media with jhama brick aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil & bigger size towards the wall & providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and MoRD technical specification clause 1204.3.8. |
| 21 | Backfilling behind abutment, wing wall & return wall complete as per drawings & MoRD technical specification Clause 1204.3.8.i) Sandy material Please Enable Macros to View BoQ information |