| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julifloratypna etc. on canal and bunds in dry/moist/slushy conditions includingdisposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.(Ordinary) |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Soft/Loose soil |
| 3 | Providing and laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction, and finishing with rendering in cement sand morter 1:3 (1 cement: 3 coarse sand) -and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(d) 20 mm |
| 4 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With initial lead of 250 m |
| 5 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.(ii) at least 98% of Standard Proctor's density |
| 6 | Watering of earth including cost of carriage of water when source of water is up to 1 Km for per cum. |
| 7 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 MM |
| 8 | Side shuttering including propping etc. complete (to achieve finish F 2 for : Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) |
| 9 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove. |
| 10 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;(d)20mm |
| 11 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985), |
| 12 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. |
| 13 | Random rubble stone masonary (using R.R. stone where 75% stones to be not less then 15cm in size in any direction and weighting not less then 23 kg.) for foundation including curing all leads of all construction materials including curing etc. complete.. In cement sand mortar 1:6 |
| 14 | Random rubble stone masonary (using R.R. stone where 75% stones to be not less then 15cm in size in any direction and weighting not less then 23 kg.) for foundation including curing all leads of all construction materials including curing etc. complete.. In cement sand mortar 1:6 Add extra over item no. 1 to 7 for Masonry work in superstructure |
| 15 | Plaster in cement sand morter 1:4 including racking of joints ,smoothfinishing &curing etc. complete including all leads of all construction material of thickness 20mm |
| 16 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate up to 20mm including shuttering etc. with all leads of material complete in all respect in thickness of 50mm |
| 17 | Removal of slit/soil/earth, sand, pebbles, 'Malba', debris, rubbish, stonepebbles & obstruction deposited in canal bed up to design line grade andsections having design due to erosion/scour/slips in canal banks/silting withor without bushes and weeds etc. in dry or moist condition from canal bedincluding dewatering, loading unloading and disposal at suitable place asdirected by Engineer in charge with initial lead of 50m. and lift upto 1.5 mwith proper dressing on canal bed complete in all respect For depth above 30cm |
| 18 | R.R. stone Masonry Kharanja with proper packing of chipping stones using hammer as per IS specification (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including all leads of all construction materials, curing etc.complete in 1: 6 Cement Mortar |
| 19 | providing and fixing steel gate ,grating and grills made angles , tees, square bar , flats , or black pipe with hold fast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide Please Enable Macros to View BoQ information |