|
| 1 | Nozzle Fixing Providing and inserting 12mm dia nipple in honey comb area recommended by into cracks/honey-comband along crack line including required díametre required spacing and making the hole & crack dust free by blowing compressed air, sealing the distance between injection nipple and allow it to cure complete as per direction of Engineer-In-Charge. |
| 2 | Injection Grouting: Injecting approved grout in proportion recommended by the manufacturer into cracks/honey-comband along crack line including required diametre required spacing and making the hole & crack dust free by blowing compressed air, sealing the distance between injection nipple with adhesive chemical of approved make and allow it to cure complete as per direction of Engineer-In-Charge. |
| 3 | Polymer Modified Micro-Concrete: Providing andlaying of polymer, modified micro-concrete or equivalent material blended with washed, saturated surface-dry (SSD), graded, pouring into the form work using suitable pumping device for uniform flow of concrete. The side shuttering can be removed after 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate. Item rate inclusive of all materials, labours, supervision, tools, tackles, transportation, curing, etc., complete as per specification and as directed. |
| 4 | Expansion Joint-Providing and fixing of expansion joint system of approved make and manufactures for various roof locations as per approved drawings and direction of Engineer-In-Charge. The joints shall be of extruded aluminum base members with, self aligning and self centering arragement support plates as per ASTM B221-02. The system shall be such that it provides watertight roof to roof/roof to corner joint cover expansion control system that is capable of accommodating multi directional seismic movement without stress to its components. System shall consist of metal profile that incorporates a universal aluminum base member designed to accommodate various project conditions and roof treatments. The cover plate shall be designed of width and thickness required to satisfy movement and loading requirements and secured to base members by utilizing manufacturer’s pre-engineered self-centering arrangement that freely rotates / moves in all directions.The Self centering arrangement shall exhibit circular sphere ends that lock and slide inside the corresponding aluminum extrusion cavity to |
| 5 | allow freedom of movement and flexure in all directions including vertical displacement. The Joint System shall resists damage or deterioration from the impact of falling ice, exposure to UV, airborne contaminants and occasional foot traffic from maintenance personnel. Provision of Moisture Barrier Membrane in the Joint System to have water tight joint is mandatory requirement. (Material shall confirm to ASTM 6063).Roof Slab Joint upto 200 mm gap |
| 6 | Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps :-i) Choping losse and cracked concretee to required depth, cleaning the exposed surface of steel and concretee with wire brush and sand papering , cleaning of concretee surface with water as necessary and getting dried.ii) Applying Epoxy primer on the exposed steel bars.iii) Applying Epoxy hardener and resin mix (as per manufectureds specification) on concretee and steel bars with brush.iv) Spreading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.v) Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete.vi) Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect. |
| 7 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. (Original producers who manufacture billet directly from iron ores and roll the billets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) |
| 8 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality filler to provide a tensile strength as per requirement and fix the Bar to the section including cost of bars. 16 mm bar |
| 9 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality filler to provide a tensile strength as per requirement and fix the Bar to the section including cost of bars. 20 mm bar |
| 10 | Rebarring work in old R.C.C structures including making bore hole to adjust required bar diameter and filling a good quality filler to provide a tensile strength as per requirement and fix the Bar to the section including cost of bars. 8 mm bar |
| 11 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3mm thick water proofing membrane, black finished reinforced with glass fiber matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 Itr/sq.mt. by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ltr and viscosity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under Joint strength in longitudinal and transverse direction at 23°C as 650/450N/5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D-5147. The laying of membrane shall be got done through the authorized applicator of the manufacturer of membrane.3 mm thick |
| 12 | Providing & laying broken glazed titles on roof ( broken glazed tiles not less than 9 Kg/Sqm) on top of hot bitumen @ 1.7 Kg/Sqm. (1.40 Kg of VG-40 (30/40 )grade and 0.30 Kg/Sqm. Of VG-10 (80/100) grade) and joints filled withcement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of Engineerin- charge. |
| 13 | Dismantling tar felt over roofing complete including stacking of serviceable material and disposal of unserviceable material within 50-meter lead. |
| 14 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Walls (any thickness) including attached pilasters, buttresses plinth and string course. |
| 15 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. |
| 16 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Columns, pillars, posts and struts etc. |
| 17 | Providing ,arranging and erecting 50mm dia M.S. pipe cup lock shuttering arrangement above the ground level upto the height given below. The girding arrangement of cup locksystem should have 2.50 meter 3.00 meter long coupling pipes and 0.90mt long lacer pipe (Horizontal bracing pipes) reconnected in both ways so as to make a square grid of size 0.90x0.90 meter in plan. The Horizontal bracing and lacer pipes should have a maximum spacing of 1.50 meter c/c both ways. The bottom of the coupling pipe must rest over a firm support at ground. the shuttering plates of 900mmx600mm size duly braced by angle supports and should rest over 50mmx50mm size wooden logs supported by 75x40x6mm size channels and |
| 18 | U-Jacks made of M.S.25mm dia steel bars with adjustable thread and lock arrangement placed at a spacing of 0.60 meter c/c. The whole arrangement should be duly shored from ground by U-Jacks and lacer pipes to prevent any lateral movement during casting of slabs. Additional support as per direction of engineer in charge are also to by provided wherever felt necessary. The work would include transportation of material erecting the whole grid structure, bracing both way, shoring, leveling of shuttering and removalof form work complete as per direction of Engineer in charge for all the floors upto the height of:- Upto 9.14 meter height |
| 19 | Dismantling tile work in floors and roofs laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meter lead: For thickness of tiles 10mm to 25mm. |
| 20 | P & F 1st qualityVitrified Porcelain Polished tiles on floor, skirting and steps etc.in different sizes (thickness to be specified by manufactuer) with water absortion less than 0.08% and conforming to IS 15622 of approved make in all colour and shade, laid with 20 mm thick CM 1 : 4 including grounting the joints with white cement and matching pigment etc complete size 600 mm X 600 mm |
| 21 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. |
| 22 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 20 mm thick. |
| 23 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar. |
| 24 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) |
| 25 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer in charge : In cement mortar |
| 26 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 27 | Add extra for facing as per design and detailed specifications including additional cost of stones Course rubble facing First sort. |
| 28 | Demolishing cement concretee manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. |
| 29 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 30 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete New Plastered Surface (three or more coats) |
| 31 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including all scaffolding: Two or more coats on new work including prepartion of base with primer, putty, lippy etc complete in all respect. |
| 32 | Carriage of Building Rubbish Stone Metal, Grit and Ballast etc. including loading and unloading complete with all lead (G-4/4.2.13) |
| 33 | Providing and laying in position Ready mix concrete manufactured in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design ofspecified grade of RCC work including pumping of R.M.C. from transit mixer to site of laying , exculding the cost of centering, shuttering and reinforcement with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. All works upto floor V floor M20 grade Design Mix by using cement as per codal provision. Add extra for providing richer mixes respectively at all floorlevels |
| 34 | Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaffolding and safety provision New Work |
| 35 | Labour Charges for removing and refixing Aluminium Partitions door including minor repair on alteration in the same. |
| 36 | Beldar |
| 37 | Dismantling GI pipes (external work) including excavation and refilling trenches after taking out the pipes and including stacking of pipes within 50 meter lead: 15mm to 40mm nominal bore |
| 38 | Dismantling CI pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into block, including stacking of pipes lead at site within 50 meter, of dia: Up to 150mm dia. |
| 39 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings, this included jointing of pipes & fittings with one step CPVC solvent cement , trenching refilling & testing of joints complete as per direction of Engineer in Charge. (External work). 25 mm nominal size |
| 40 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings, this included jointing of pipes & fittings with one step CPVC solvent cement , trenching refilling & testing of joints complete as per direction of Engineer in Charge. (External work). 50 mm nominal size |
| 41 | P&F rigid PVC Pipe (IS:4985 mark) class II/ (4 Kg. /Cm2 .) approved quality /make including joining the pipe with solvent cement rubber ring and lubricant. 160 mm dia |
| 42 | Providing and fixing Granite stone slab mirror polished and machine edge cut in walls, pillars, steps, Shelves, Sills Counters, Floors etc. laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) jointing with white cement mortar 1:2 (1white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete. South Zed Black Above 3601 Cm2 Slabs Please Enable Macros to View BoQ information |