| 1 | Dag belling work up to 5 to 7.5 cm depth(6b) in 5 line |
| 2 | जंगल की सफाई] भारी झाडि़यों तथा 30 सेमी लपेट तक के पौधों को काटने समेत। |
| 3 | Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5 m (25cm depth) |
| 4 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थकर को अलग करना (Sorting of grass & pebbles) एवं बण्डb (Bund) का सेक्शbन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 मशीनरी कार्य uje मिट्टी (in Soft Soil) |
| 5 | मिट्टी को 8 से 10 टन रोलर से 90 प्रतिशत प्रोक्टर डेनसिटी तक दबाना। इकाई : घन मीटर |
| 6 | Watering of earth including cost of carriage of water when source of water is, up to 1 Km, deduct 10% CPWRD 2022, Chapter V, Item no. 28 (a) |
| 7 | Dosjh jfol ftlesa 40 izfr'kr iRFkj ds Liky gks ;k dadj ;k ?kkMyk dks fcNkuk rFkk vkiwfrZ djuk] ikuh fNMduk rFkk nqjewV ls dqVukA |
| 8 | वेरद्धा पत्थरो का सीमेन्ट मसाला 1:6 मसाले में खरंजे का कार्य हेतु पत्थरों की आपूर्ति,अन्य निर्माण सामग्री की आपूर्ति, सीमेन्ट मसाले मे खरंजा लगाना, दो पत्थरो के बीच के खाली जगह को सीमेन्ट मसाले से पूरी उचाई तक भरना, होदा में से निकली अतिरिक्त मिट्टी का 50 मीटर तक निस्तारण करना। । |
| 9 | Construction of tubewell up to 100m depth and above to accomodate housing and assembly pipe in all types of alluvium strata by rotay drilling method with \\"code of practice for construction and testing of tubewells (IS:2800 (Part-II) : 1991 and IS:2800 (Part-II) :1979 both amended up to date) with supply of bail plug if necessary.The work will not include cost of housing pipe and strainer pipe assembly cost, gravel and development work. Work would be deemed completed only after obtaining sound free water during pumping. PWD BSR 2022 ITEM 4.23 (10 % LESS CP)250 MM DIA. |
| 10 | Supply of Strainer Pipes Made of ERW M.S. black pipe ISI mark of following sizes at the site of work including required size of slotting as per IS:8110-1985. PWD BSR 2022 chapter S-4 ITEM 4.6.2 (10 % LESS CP) |
| 11 | 40,e-,e- jksM+h e; vkiwfrZ |
| 12 | 20,e-,e- jksM+h e; vkiwfrZ |
| 13 | ctjh e; vkiwfrZ ,oa ifjogu 20 fd eh rd |
| 14 | Supply & lowering air line of 25mm dia, G.I. pipe 'B' class having perforation 3 to 5mm size all arrow of G.I. pipe in Zig-Zag fashion & making air vent at top including the cost of Tee- Nipples, Elbow, Socket etc. PWD BSR 2022 ITEM 4.26 (10 % LESS CP) |
| 15 | नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्तारण करना HARD Soil |
| 16 | नींव तथा कुर्सी प्रथम श्रेणी ईंट की चिनाई सीमेन्ट -बजरी 1:6 मसाले में, मय बगल की झिरी बन्द करने तथा तराई सहित। |
| 17 | सीमेंट प्लास्टर दीवार पर 1:6 अनुपात में सीमेंट-बजरी मिलाकर जोड़ों को कुरेदने तथा 14 दिन तक नियमित तराई समेत। |
| 18 | SS/F |
| 19 | Display board And Photographs etc Please Enable Macros to View BoQ information |