| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard/Dense soil |
| 2 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock |
| 3 | Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm(For mix design Cement content considered 320 kg/ cum of concrete) |
| 4 | Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm(For mix design Cement content considered 420 kg/ cum of concrete) |
| 5 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. |
| 6 | Side shuttering including propping etc. complete (to achieve finish F 2) for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) |
| 7 | Centering and shuttering for piers, galleries, barrels, intake well, sluice well upto 3.0m height from base/floor level (To achieve F2 finish) |
| 8 | Back filling behind abutment, wing wall and return wall, in 150mm layers, with mechanical compaction, complete with all lead and lift, as per drawing and technical specification. [MoRTH Specification : Clause 304] sandy material |
| 9 | Extra Charges For using Mobile Transite Mixer (i.e Flori) |
| 10 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. |
| 11 | In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) |
| 12 | Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work Please Enable Macros to View BoQ information |