| 1 | Assembling & proper alignment of 2000pump motor set at shatabdi workshop |
| 2 | Modification of baseplate with cutting & welding of channel to fixing the 2000GPM pump motor on the baseplate properly |
| 3 | Dismantling & withdrawal of damaged pontoon 01set (2 big box and 4 small box) from main patch sump |
| 4 | Transporting of dismantled damaged pontoon set (2 big box and 4 small box) from main patch sump to w/shop for repairing 8headx2shift=16head |
| 5 | Transporting of repaired pontoon set (2 big box and 4 small box) from W/shop to main patch sump 8headx2shift=16head |
| 6 | Assembling & installation of the repaired Pontoon at main patch sump |
| 7 | Installation of the Pump, Motor & baseplate on the pontoon with proper alignment |
| 8 | Transporting and fitting of suction of the pump |
| 9 | Transporting and fitting of 10\\"dia Nipple, 10\\"dia M.S.Bend, 10\\"dia shortpiece in the delivery side of the Pump |
| 10 | Transporting & fitting of 8\\"dia hose for jointing of delivery |
| 11 | Transporting & fitting of sluice valve & N.R. valve |
| 12 | Transporting, laying and jointing of 8\\"dia M.S.Pipe in the proposed delivery 13Nos.×20'=260ft |
| 13 | Vertically laying & jointing of 8\\"dia M.S. Pipe in the proposed range 10headx02shift=20head |
| 14 | Fabrication & making of 8\\"dia Taper pipe |
| 15 | Fabrication & making of 8\\"dia M.S. shortpiece |
| 16 | Fabrication & making of 8\\"dia M.S. bend |
| 17 | Fabrication & making of 10\\"/8\\"dia reducer |
| 18 | PVC cable laying, hanging & shifting from pole to the starter & starter to the motor |
| 19 | Fabrication & fitting of a matching piece of 8\\"dia M.S. pipe in the delivery |
| 20 | Providing of bolt nut & washer |
| 21 | Providing of rubber joints |
| 22 | Alignment of pump motor set & commissioning the pump |
| 23 | Placement of pontoon after Alignment & commissioning of pump motor on the pontoon to the desire place of the sump |
| 24 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |