| 1 | Dismentalling of B.O.E soling/Inter locking tiles Including Stacking of servicable material and disposal of unservicable material within a lead of 50m as per direction of EI/C (Labour only) (PWD SOR 2022-23, Chepter-20, Serial No.19 Item No. New) |
| 2 | Deduction for old interlockiing tiles……………………all complete. |
| 3 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or into plinth and removal and disposal of surplus earth as directed by thr Engineer in charge up to a distance of 30m from the foundation trenches.(PWD SOR 2025-26, chepter-4, Item No.01 Spec-251) |
| 4 | Grandular Sub-base with well Graded Material (Table 400.1) (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis) |
| 5 | R.C.C work in raft/foundation with cement, coarse sand and 2 cm (3/4\\") gauge approved stone grit in the promotion 1:2:4 excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessary centering and shuttering etc and also including supply of all materials labour and tools and plants etc. required to proper completion of the work/strength of the concrete shall not be less than M-15. |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23 chapter-5, Item No. 5.3) |
| 7 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No. 8 spec. No. 5.1) |
| 8 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) |
| 9 | CEMENT CONCRETE PAVEMENT(C.C ROAD) Construction of unreinforced cement concrete road with cement, coarse sand and stone grit and fixing of 125 micron thick polythene film, ..... …………….Complete CHAPTER- 20 (New Item) |
| 10 | Supply and fixing Manak board …………………….. All Complete. |
| 11 | Construction of Inauguration /Silla patta board using brick work and granite stone …………. All complete. Please Enable Macros to View BoQ information |