| 1 | Earth work in Mar , ranker and kankar mixed soil for excavation of foundation i/c all cost of labour materials and T&P for proper completion of work as per direction of Engineer-in-Charge. |
| 2 | Earth work in Mar, Ranker and Kanker mixed soil in digging or in embankment including lead up to 395.00 m and lift upto 1.50 m with manual compaction and dressing. |
| 3 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement mortar |
| 4 | Laying & spreading Local sand or moorum plaster in sub grade below C.C. lining for proper completion of work as per direction of Engineer-in-Charge. |
| 5 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc. |
| 6 | Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc. |
| 7 | Centering & shuttring for R.C.C. & C.C. work in bed block, slab & foundation C.C. including cost of all material and T&P etc. |
| 8 | Reinforcement for R.C.C. work i/c cutting , bending,& binding& placing in position including cost of material, labour, T& P etc. |
| 9 | R.C.C. 1:1.5:3 with stone grit (10-20mm) size i/c all cost of labour and T & P etc. |
| 10 | Struck pointing 1:2 cement mortat including all cost of material, labour and T&P etc. |
| 11 | Finishing walls with waterproofing cement paint (Snowsum) of approved make & quality on new work with two coat to give an even shade i/csupply of all materials labour and t&p. |
| 12 | Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 110 mm PE 100 pipe PN4, IS-4984 |
| 13 | Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 160 mm PE 100 pipe PN6, IS-4984. |
| 14 | Providing and laying C.C. (1:2:4) in coping with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |