| 1 | Dismantling old interlocking tiles including stacking of servicable materials and disposale of unservicable materials within a lead of 50 meters as per dircticon of EI/C. |
| 2 | Deduction for dismanteled Interlocking tiles…… all complete. |
| 3 | Disposal of malba from site with cartage up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis of Rate) |
| 5 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) . (PWD SOR 2025-26, Chepter-5, Item No.9 Spec no. 5.2) |
| 6 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWDSOR 2022-23 Chapter No-05 Item No. 5.2spec. No. 5.2.2) |
| 7 | CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side fromwork ........... 1501 (approved Quarri grit) (PWD SOR 2025-26, Chepter-12, SI N0 11) |
| 8 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 ) |
| 9 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) |
| 10 | Supply and fixing Manak board …………………….. All Complete. |
| 11 | Construction of Inauguration /Silla patta board using brick work and granite stone …………. All complete. Please Enable Macros to View BoQ information |