|
| 1 | Earth work in Mar, Rankar and Kankar mixed soil in filling for Strengthening of Bank & Service Road i/c extra for lead up to 195m |
| 2 | Cutting heavy under growth trees upto 7.50cm dia, including removal of roots with collection and removal. |
| 3 | Dismantling of old and damaged brick/stone masony and plain concrete with lime or cement motar for proper completion of work as per direction of Engineer-in-Charge. |
| 4 | Earth work in Mar kaber ranker mixed soil for excavation foundation i/c all cost of labour materials and T&Pf or proper completion of work as per direction of Engineer-in-Charge. |
| 5 | Laying & spreading of Local sand in foundationfor proper completion of work as per direction of Engineer-in-Charge. |
| 6 | Laying brick rora under the foundation of Apron with proper compaction including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. |
| 7 | Laying cement concrete mix with 1:3:6 in foundation with compaction and curing including all cost material labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. |
| 8 | C.C. 1 : 1.5 : 3 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. |
| 9 | C.C. 1 : 1 : 2 with Stone Grit (20 mm) size i/c all cost of labour and T&P etc.for proper completion of work as per direction of Engineer-in-Charge. |
| 10 | Laying cement concrete mix 1:2:4 with stone grit (20mm) i/c all cost of labour and T&P etc.required for proper completion of work as per direction of Engineer-in-Charge. |
| 11 | Centering & Shuttering for C.C. & R.C.C.work with all lead & lift required for proper completion of work including cost of materials and scafolding labours, T&P, etc. |
| 12 | Reinforcement of steel with cutting bending and binding and palcingin position with i/c all cost of labour materials and T.&P. |
| 13 | Brick work (M-150) with 1:4 cement motar including all cost material labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 14 | Earth work in Mar,Kankar and Kankar mixed soil filling, raising & stg of bank i/c lead upto 30.00 m and lift 1.50 m with manual compaction and dressing etcfor proper completion of work as per direction of Engineer-in-Charge. |
| 15 | Cement Plaster of 12mm thick 1:3 cement mortar including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 16 | Struck pointing 1:2 cement mortar including all cost of material, labour and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. |
| 17 | P/Afor two coat of Exterior Emulsion including primer on new surface As per instruction of Engineer-in-Charge (Make Asian apex Ultima, Berger All weather Guard & equ.) |
| 18 | Fabrication and fixing of canal gate shutter including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge. |
| 19 | Supply and fixing of canal gate threaded shoft including all cost of material labour T&P etc for proper completion of work as directed by Engineer-in-charge. |
| 20 | Painting on old rusted steel surface of gates and appurtenances after preparation of surface properly by sand blasting process and applying two coat of Zinc Rich primer and two coat of solvent less epoxy paint including cost of all material, labour T&P and scaffolding required for proper completion of work. |
| 21 | Providing and Laying of LDPE Film on footing box including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 22 | Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 23 | Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 160 mm PE 100 pipe PN6, IS-4984 |
| 24 | Supply , Laying , jointing ,testing and commisionning the HDPE pipe in standard length confirming to I.S. 4984 , I.S. 7634 etc . including cost of Transportation , fright charges , inspection charges ,loading unloading charges , conveyance to departmental store / site and stacking the same , sand cusion of 15 cm thick all around the pipe etc. Complete in all respect to the operational form as per direction of Engineer in charge. HDPE pipe 110 mm PE 100 pipe PN4, IS-4984 |
| 25 | Painting canal gauges in three colours of enamel paints including figures with cost of labour and enamel paint. for proper completion of work as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |