| 1 | Sub-Head : Earth Work |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. |
| 4 | All kinds of soil |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 6 | All kinds of soil. |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 8 | Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. |
| 9 | All kinds of soil. |
| 10 | Sub-Head : Concrete Work |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 12 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 13 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 14 | Sub-Head : Reinforced Cement Concrete |
| 15 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 16 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 17 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 18 | Foundations, footings, bases of columns, etc. for mass concrete |
| 19 | Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 20 | Columns, Pillars, Piers, Abutments, Posts and Struts |
| 21 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 22 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 23 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). |
| 24 | Sub-Head : Masonry Work |
| 25 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.0 in foundation and plinth in: |
| 26 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 27 | Sub-Head : Steel Work |
| 28 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete |
| 29 | Sub-Head : Finishing |
| 30 | 12 mm cement plaster of mix : |
| 31 | 1:6 (1 cement: 6 coarse sand) |
| 32 | Applying priming coat |
| 33 | With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works |
| 34 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 35 | Two or more coats on new work |
| 36 | Sub-Head : Road/Fencing Work |
| 37 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. |
| 38 | With G.I. barbed wire |
| 39 | Sub-Head : Dismantling and Demolishing |
| 40 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. |
| 41 | In cement mortar |
| 42 | Sub-Head : MARKET RATED ITEMS |
| 43 | Carriage of anchor bolts, templates, nuts, guide angle and base plate as required as per direction of Engineer-in-charge from place of store at BHUBANESWAR to work site at Balakati .( Rate includes sorting, labour charges in loading and unloading, safe handling etc all complete.) |
| 44 | Galvanising of MS high density tower anchor nuts, washers & bolts (36 nos top 0.20m length) etc as per requirement all complete as per direction of Engineer-in-charge, for protecting against corrosion in coastal & extreme weather conditions area. |
| 45 | Labour charges for arranging and fixing the anchor bolts of 32mm dia @ 9.00 nos in each column (Total 36 nos) including nuts and base plate etc. in position as per direction of Engineer-in-charge. (Templates and anchor bolts, nuts and washers will be supplied by the department) |
| 46 | Providing and fixing ring earth consisting of specified and required ring size at site and laying of G.I. Flats of size 50 x 6 mm laid at the bottom of the tower foundation pit, one metre away from the tower base. The G.I. flats shall be connected with each other with G.I. nuts and bolts after placing lead strips/ lead wool of 90x50x1mm thick in between and with legs of tower with G.I. nuts and bolts with spring washers. All the joints shall be properly wrapped and sealed by water proof tape to avoid ingress of moisture. The G.I flats shall be covered with fine and cohesive good earth all around and duly compacted. The G.I. flats shall be bent in such a way that curves are smooth having radius not less than one metre. The rate shall be inclusive of all materials and labour including tools and plants, incidental cost etc. all complete and nothing extra shall be paid on any account except earthwork in excavation, filling available excavated earth or good earth brought from outside as the case may be. (Note: Payment shall be made only if the ohmic value of the earth resistance is 1.0 ohms or less. Security deposit for the whole work will be released only after completion of A/T Any rectification required to make earth resistance to 1.0 ohms or less is to be carried out by the agency. If the A/T is not done in one year after completion of work 75% of S.D. will be released. Remaining part of S.D. will be released after completion of A/T). Please Enable Macros to View BoQ information |