| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof. |
| 2 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specificpermission of Engineer-in-Charge prior to execution will be necessary).(Payment to be made on area cleared). |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.Depth of excavation not exceeding 1,500 mm. |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)With earth obtained from excavation of foundation. |
| 5 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 6 | Supplying and laying Polythene Sheet (150gm / sq.m.) overdamp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.Pakur Variety |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.Pakur Variety |
| 9 | Brick work with 1st class bricks in cement mortar (1:4)In foundation and plinth |
| 10 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 11 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.For works in foundation, basement and upto roof of ground floor/upto 4 mTor steel/Mild Steel |
| 12 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)25 mm to 30 mm shuttering without staging in foundation |
| 13 | 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 14 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]With 1:4 cement mortar15 mm thick plaster |
| 15 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in-charge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work ncluding all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.For structural members of specified sections weighing less than22.5 Kg./m. |
| 16 | Supplying, fitting galvanised 3 ply 12 gauge / 4 points line of barbed wire in fencing (holes already made in the body of the post) or fixed by staples tightening and fixing the wires in taut condition with straining bolts including the cost of cutting and of lapping joints in the wire as necessary but excluding the cost of galvanised staples,straining bolt and binding wire where necessary. |
| 17 | Surface dressing of the ground in any kind of soil including vegetation in equalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed |
| 18 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 19 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :On steel or other metal surface :With super gloss (hi-gloss) -Two coats (with any shade except white) |
| 20 | White washing including cleaning and smoothening surface thoroughlyAll floors :One coat |
| 21 | Colour washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly : |
| 22 | Supplying, fitting, fixing, Chain link fencing of approved qualitywith R.C.C posts wooden posts or iron posts bymeans ofgalvanised \\"C\\" clips to grid of horizontal strands of galvanisedhigh tensile spring steel wire of 12 S.W.G which have to betensioned and fixed to the vertical posts by means of galvanisedspecial clips, bolts and nuts etc (II) 65 mm. x 65 mm. x 8 g Please Enable Macros to View BoQ information |