| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | All kinds of soil. |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. |
| 5 | All kinds of soil |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level : |
| 7 | Concrete of M10 grade with minimum cement content of 220 kg /cum |
| 8 | Concrete of M25 grade with minimum cement content of 300 kg /cum |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : |
| 10 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 11 | Suspended floors, roofs, landings, balconies and access platform |
| 12 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 13 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 14 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level |
| 15 | Concrete of M25 grade with minimum cement content of 330 kg /cum |
| 16 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 17 | Two or more coats on new work |
| 18 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 19 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. |
| 20 | With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre |
| 21 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 22 | Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) |
| 23 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 24 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 25 | Making bell mouth opening/ entrance of size 100x50x50 cm for drainage pipe under footpath, including providing cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) for shape of bell mouth, including plastering providing and fixing precast R.C.C./ S.F.R.C. slab including plastering with cement mortar 1:3 (1 cement : 3 fine sand) of 6 mm thickness on exposed surface of the slab & bell mouth including centring, shuttering & neat cement punning inside the bell mouth etc. all complete. |
| 26 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 27 | Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50mx2.00m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube posts/horizontal members/bracings covered with 1.63mm thick MS sheet. The sheet shall be fixed with 30x5mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5m. MS channel ISLC 75 @ 5.70 kg/m, 50cm long shall be provided at the bottom having oval shaped holes of size 50x25mm at both ends with 50cm long MS angle 40x40x6mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250mm long expansion fasteners at both ends. The work shall be executed as per drawing/direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work). |
| 28 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 29 | Providing and placing in position 150 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 150 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. |
| 30 | Providing and laying Tactile tile (for vision impaired persons as per standards) of size 300x300x60 mm having with water absorption less than 0.5% and conforming to 1S:15622 of approved make in all colours and shades in for outdoor floors such as footpath, court yard, multi modals location etc, laid on 20 mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc. complete as per direction of Engineer-in-Charge. |
| 31 | 60mm thick Tactile paver block of M-30 grade with approved colour, design & pattern. |
| 32 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 20 mm thick bed of cement mortar 1:4 (1 cement : 4 coarse sand), compacting and proper embedding/laying of inter locking paver blocks including grouting the joints with white cement mixed with matching pigments etc. complete as per the direction of Engineer-in-Charge. |
| 33 | 60 mm thick cement concrete inter locking paver block of M-35 grade with approved colour, design & pattern. |
| 34 | Modified Estimated Cost due to correction in GST Rate @ 0.973 =(Estimated cost based on DSR 2023 items *0.973) = (-) (20933454*0.027= 565203) |
| 35 | Add 3% Cost Index on DSR 2023 |
| 36 | Providing & fixing pre-fabricated precast solid open U shaped RCC drain, drain enver, box culvert, crash barrier retaining wall sit chamber etc, using wet-cast technology with self-compacting concrete of grade M-50 anit thermo-mechanically treated (TMT) steel bars of grade Fe-550D including straightening sitting bending placing in position and binding all complete upto plinth level with provisions of shear keys, connecting loops necessary cutouts/holes lined with dowel tubes of required stress for services with proper lifting arrangement of various thicknesses, shape and size using high quality steel molds including loading transportation from factory to site of work unloading stacking at site and placing in final position with the help of repaired capacity cranes all complete as per IS-11447.1985 and as per approved shop drawings and design mix complete as per the directions of Engineer-In-Charge. The RCC precast drain along with drain cover taken together as an integrated system, shall be capable of carrying a wheel load of 5 Ton ef vehicular load.The precast elements shall be manufactured in a controlled factory environment with approved methodology/technology having all facilities including automated steam curing, automated reinforcement cage making facility. NABL, accredited in-house laboratory with all testing facilities etc. complete as per the directions of Engineer-in-ChargeThe installation of RCC precent drain, drain cover, box culvert etc. shall be done in correct and final position with proper line, level and plumb at site after making all arrangements of requisite T&P eg. cranes, push-pull jacks etc. for lifting, placing and alignment of elements within erection tolerance as per IS-15916 2020, as per approved shop drawings, complete as per direction of Engineer-in-Charge including cost of all material and all tools & machinery required for casting for all works up to plinth level complete as per the direction of Engineer-in- Charge. |
| 37 | Credit for old/damaged dismantled Steel received from site as per direction of Engineer-in-charge ( Dismantled strucural steel will be property of the Contractor) |
| 38 | Credit for old kerb stone received from site as per direction of Engineer-in-charge ( Dismantled Brick will be property of the Contractor) Please Enable Macros to View BoQ information |