Drinking Water Supply and Sanitation Government Departments Closing in 2 days TDR #54386827

Tender For Construction Of Pump House And Control Room, Construction Of Sump Well, Lining Of Sirhind Canal And Neelon Drain, Construction Of Protection Works At Outfall Of Riser Main, And Joining Of Np3 700 Mm Dia Pipe With Sump Well For Construction

Issued by Government Departments · Ludhiana, Punjab
Tender Value
3.80 Crore
Estimated cost
Bid Submission
23 Jul 2026
2 days left
EMD
7.61 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ludhiana → Punjab
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Pump House And Control Room, Construction Of Sump Well, Lining Of Sirhind Canal And Neelon Drain, Construction Of Protection Works At Outfall Of Riser Main, And Joining Of Np3 700 Mm Dia Pipe With Sump Well For Construction Of Surface Pumps For Lifting Water From Sirhind Canal At Rd 145700/R Into Neelon Drain ( Civil Work )

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 13-Mar-2026 corrigendum13032026 Date 14-Mar-2026
2 14-Mar-2026 corrigendum14032026 Date 16-Mar-2026
3 13-Mar-2026 corrigendum13032026 Date 14-Mar-2026
4 13-Mar-2026 corrigendum13032026 Date 14-Mar-2026
5 16-Mar-2026 corrigendum16032026 Date 17-Mar-2026
6 14-Mar-2026 corrigendum14032026 Date 16-Mar-2026
7 16-Mar-2026 corrigendum16032026 Date 17-Mar-2026
8 17-Mar-2026 corrigendum17032026 Date 19-Mar-2026
9 14-Mar-2026 corrigendum14032026 Date 16-Mar-2026
10 13-Mar-2026 corrigendum13032026 Date 14-Mar-2026
11 19-Mar-2026 corrigendum19032026 Date 20-Mar-2026
12 20-Mar-2026 corrigendum20032026 Date 21-Mar-2026
13 17-Mar-2026 corrigendum17032026 Date 19-Mar-2026
14 16-Mar-2026 corrigendum16032026 Date 17-Mar-2026
15 19-Mar-2026 corrigendum19032026 Date 20-Mar-2026
16 17-Mar-2026 corrigendum17032026 Date 19-Mar-2026
17 14-Mar-2026 corrigendum14032026 Date 16-Mar-2026
18 16-Mar-2026 corrigendum16032026 Date 17-Mar-2026
19 21-Mar-2026 corrigendum21032026 Date 24-Mar-2026
20 20-Mar-2026 corrigendum20032026 Date 21-Mar-2026
21 19-Mar-2026 corrigendum19032026 Date 20-Mar-2026
22 17-Mar-2026 corrigendum17032026 Date 19-Mar-2026
23 16-Mar-2026 corrigendum16032026 Date 17-Mar-2026
24 02-Apr-2026 corrigendum02042026 Date 06-Apr-2026
25 01-Apr-2026 corrigendum01042026 Date 02-Apr-2026
26 30-Mar-2026 corrigendum30032026 Date 01-Apr-2026
27 06-Apr-2026 corrigendum06042026 Date 07-Apr-2026
28 02-Apr-2026 corrigendum02042026 Date 06-Apr-2026
29 01-Apr-2026 corrigendum01042026 Date 02-Apr-2026
30 30-Mar-2026 corrigendum30032026 Date 01-Apr-2026
31 09-Apr-2026 corrigendum09042026 Date 10-Apr-2026
32 07-Apr-2026 corrigendum07042026 Date 09-Apr-2026
33 06-Apr-2026 corrigendum06042026 Date 07-Apr-2026
34 07-Apr-2026 corrigendum07042026 Date 09-Apr-2026
35 06-Apr-2026 corrigendum06042026 Date 07-Apr-2026
36 02-Apr-2026 corrigendum02042026 Date 06-Apr-2026
37 13-Apr-2026 corrigendum13042026 Date 16-Apr-2026
38 10-Apr-2026 corrigendum10042026 Date 13-Apr-2026
39 09-Apr-2026 corrigendum09042026 Date 10-Apr-2026
40 07-Apr-2026 corrigendum07042026 Date 09-Apr-2026
41 10-Apr-2026 corrigendum10042026 Date 13-Apr-2026
42 07-Apr-2026 corrigendum07042026 Date 09-Apr-2026
43 09-Apr-2026 corrigendum09042026 Date 10-Apr-2026
44 06-Apr-2026 corrigendum06042026 Date 07-Apr-2026
45 25-Mar-2026 corrigendum25032026 Date 27-Mar-2026
46 24-Mar-2026 corrigendum24032026 Date 25-Mar-2026
47 21-Mar-2026 corrigendum21032026 Date 24-Mar-2026
48 20-Mar-2026 corrigendum20032026 Date 21-Mar-2026
49 24-Mar-2026 corrigendum24032026 Date 25-Mar-2026
50 21-Mar-2026 corrigendum21032026 Date 24-Mar-2026
51 20-Mar-2026 corrigendum20032026 Date 21-Mar-2026
52 19-Mar-2026 corrigendum19032026 Date 20-Mar-2026
53 17-Mar-2026 corrigendum17032026 Date 19-Mar-2026
54 30-Mar-2026 corrigendum30032026 Date 01-Apr-2026
55 27-Mar-2026 corrigendum27032026 Date 30-Mar-2026
56 25-Mar-2026 corrigendum25032026 Date 27-Mar-2026
57 27-Mar-2026 corrigendum27032026 Date 30-Mar-2026
58 24-Mar-2026 corrigendum24032026 Date 25-Mar-2026
59 25-Mar-2026 corrigendum25032026 Date 27-Mar-2026
60 21-Mar-2026 corrigendum21032026 Date 24-Mar-2026
61 20-Mar-2026 corrigendum20032026 Date 21-Mar-2026
62 17-Apr-2026 corrigendum17042026 Date 20-Apr-2026
63 16-Apr-2026 corrigendum16042026 Date 17-Apr-2026
64 20-Apr-2026 corrigendum20042026 Date 22-Apr-2026
65 17-Apr-2026 corrigendum17042026 Date 20-Apr-2026
66 16-Apr-2026 corrigendum16042026 Date 17-Apr-2026
67 13-Apr-2026 corrigendum13042026 Date 16-Apr-2026
68 27-Apr-2026 corrigendum27042026 Date 28-Apr-2026
69 22-Apr-2026 corrigendum22042026 Date 23-Apr-2026
70 20-Apr-2026 corrigendum20042026 Date 22-Apr-2026
71 17-Apr-2026 corrigendum17042026 Date 20-Apr-2026
72 16-Apr-2026 corrigendum16042026 Date 17-Apr-2026
73 13-Apr-2026 corrigendum13042026 Date 16-Apr-2026
74 10-Apr-2026 corrigendum10042026 Date 13-Apr-2026
75 20-Apr-2026 corrigendum20042026 Date 22-Apr-2026
76 17-Apr-2026 corrigendum17042026 Date 20-Apr-2026
77 23-Apr-2026 corrigendum23042026 Date 27-Apr-2026
78 22-Apr-2026 corrigendum22042026 Date 23-Apr-2026
79 23-Apr-2026 corrigendum23042026 Date 27-Apr-2026
80 22-Apr-2026 corrigendum22042026 Date 23-Apr-2026
81 30-Apr-2026 corrigendum30042026 Date 04-May-2026
82 29-May-2026 corrigendum29052026 Date 30-May-2026
83 28-May-2026 corrigendum28052026 Date 29-May-2026
84 25-May-2026 corrigendum25052026 Date 28-May-2026
85 22-May-2026 corrigendum22052026 Date 25-May-2026
86 20-May-2026 corrigendum20052026 Date 22-May-2026
87 22-May-2026 corrigendum22052026 Date 25-May-2026
88 28-May-2026 corrigendum28052026 Date 29-May-2026
89 25-May-2026 corrigendum25052026 Date 28-May-2026
90 20-May-2026 corrigendum20052026 Date 22-May-2026
91 18-May-2026 corrigendum18052026 Date 20-May-2026
92 15-May-2026 corrigendum15052026 Date 18-May-2026
93 14-May-2026 corrigendum14052026 Date 15-May-2026
94 12-May-2026 corrigendum120526 Date 13-May-2026
95 13-May-2026 corrigendum13052026 Date 14-May-2026
96 11-May-2026 corrigendum11052026 Date 12-May-2026
97 20-May-2026 corrigendum20052026 Date 22-May-2026
98 18-May-2026 corrigendum18052026 Date 20-May-2026
99 15-May-2026 corrigendum15052026 Date 18-May-2026
100 14-May-2026 corrigendum14052026 Date 15-May-2026

BOQ

Name of Work:- Construction of Pump House and Control Room, Construction of Sump Well, Lining of Sirhind Canal and Neelon Drain, Construction of Protection Works at Outfall of Riser Main, and Joining of NP3 700 mm Dia Pipe with Sump Well for Construction of Surface Pumps for Lifting Water from Sirhind Canal at RD 145700/R into Neelon Drain ( Civil work )
Sl. No. Item Description
1Excavation in soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming, bottom and side slopes, in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30m.
2Plain cement concrete M-15 plain/Reinforced cement concrete in open foundation complete as per drawings and technical specifications
3Reinforced cement concrete grade M-25 in sub-structure complete as per drawing and Technical specifications using Batching plant,transit mixer and concrete pump (height upto 5m)
4Reinforced cement concrete grade M-25 For solid slab super structure complete as per drawing and Technical specifications using Batching plant,transit mixer and concrete pump (height upto 5m)
5Reinforced cement concrete grade M-25 For solid slab super structure complete as per drawing and Technical specifications using Batching plant,transit mixer and concrete pump (height 5m to 10 m)
6Reinforced cement concrete grade M-30 For solid slab super structure complete as per drawing and Technical specifications using Batching plant,transit mixer and concrete pump (height upto 5m)
7Reinforced cement concrete grade M-30 in sub-structure complete as per drawing and Technical specifications using Batching plant,transit mixer and concrete pump (height upto 5m)
8First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth
9Cold twisted deformed (Ribbed/Tor Steel Bar) Bars Fe500 grade as per IS 1786-1985, for R.C.C. works, where not including in the complete rate of R.C.C. including bending and placing in position complete in all respect.
10Making bore and installation of pumping set for dewatering arrangements complete in all respect.
11Providing, Running and maintenance of pumping set 8 H.P./Generator Set for dewatering arrangements complete in all respect.
12Preparation of Plastered or concrete surface for Painting (including sand Papering the surface using ready mix cement based wall putty by applying two or more coat to get a required finish.
13Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered,concrete surface to give an even shade.
14Iron grated doors, including pintle hinges & arrangements.
15RECESSED PVC CONDUIT PIPE WIRING SYSTEM WITH MODULAR SWITCHES:: Wiring in PVC insulated copper conductor single core FR cable (ISI marked) overall 1.5sq. mm, 1100volts grade to be laid in heavy gauge PVC conduit pipe 20mm/25mm dia. (ISI Marked) recessed in wall etc., complete with powder coated/anodized concealedmetal boxes (1.6mm thick with Brass lugs) required for suitable number of modules (Modular accessories) for having Step type electronic fan regulators (two module) 100watts, bell push, 6Amp. 2/3 universal socket (shuttered), 16/20Amp. combined/ universal Socket (shuttered), 6/10Amp. Switches,16/20Amp.switches with indicator etc. and covered with Frame Plate etc., PVC connector (For Fan Box and Call Bell), Steel Hooks, Sheet metal fan box (1.6mm thick shape hexagonal), Circular junction Boxes ( Fourway PVC1½\\"deep for walls and CI 3\\"deep for ceiling), bonding to earth with PVC insulated copper conductor singlecore FR cable (ISImarked) 1sq.mm, 1100volts grade (For 6Amp. wall socket & plug control point) and other petty material etc., including the cost of above material, cutting and filling up of chases (with finishing the surface): a)- Wiring fan point (With fan box).
16RECESSED PVC CONDUIT PIPE WIRING SYSTEM WITH MODULAR SWITCHES:: Wiring in PVC insulated copper conductor single core FR cable (ISI marked) overall 1.5sq. mm, 1100volts grade to be laid in heavy gauge PVC conduit pipe 20mm/25mm dia. (ISI Marked) recessed in wall etc., complete with powder coated/anodized concealedmetal boxes (1.6mm thick with Brass lugs) required for suitable number of modules (Modular accessories) for having Step type electronic fan regulators (two module) 100watts, bell push, 6Amp. 2/3 universal socket (shuttered), 16/20Amp. combined/ universal Socket (shuttered), 6/10Amp. Switches,16/20Amp.switches with indicator etc. and covered with Frame Plate etc., PVC connector (For Fan Box and Call Bell), Steel Hooks, Sheet metal fan box (1.6mm thick shape hexagonal), Circular junction Boxes ( Fourway PVC1½\\"deep for walls and CI 3\\"deep for ceiling), bonding to earth with PVC insulated copper conductor singlecore FR cable (ISImarked) 1sq.mm, 1100volts grade (For 6Amp. wall socket & plug control point) and other petty material etc., including the cost of above material, cutting and filling up of chases (with finishing the surface): b)- Wiring light point.
17RECESSED PVC CONDUIT PIPE WIRING SYSTEM WITH MODULAR SWITCHES:: Wiring in PVC insulated copper conductor single core FR cable (ISI marked) overall 1.5sq. mm, 1100volts grade to be laid in heavy gauge PVC conduit pipe 20mm/25mm dia. (ISI Marked) recessed in wall etc., complete with powder coated/anodized concealedmetal boxes (1.6mm thick with Brass lugs) required for suitable number of modules (Modular accessories) for having Step type electronic fan regulators (two module) 100watts, bell push, 6Amp. 2/3 universal socket (shuttered), 16/20Amp. combined/ universal Socket (shuttered), 6/10Amp. Switches,16/20Amp.switches with indicator etc. and covered with Frame Plate etc., PVC connector (For Fan Box and Call Bell), Steel Hooks, Sheet metal fan box (1.6mm thick shape hexagonal), Circular junction Boxes ( Fourway PVC1½\\"deep for walls and CI 3\\"deep for ceiling), bonding to earth with PVC insulated copper conductor singlecore FR cable (ISImarked) 1sq.mm, 1100volts grade (For 6Amp. wall socket & plug control point) and other petty material etc., including the cost of above material, cutting and filling up of chases (with finishing the surface): c)- Wiring call-bell point
18RECESSED PVC CONDUIT PIPE WIRING SYSTEM WITH MODULAR SWITCHES:: Wiring in PVC insulated copper conductor single core FR cable (ISI marked) overall 1.5sq. mm, 1100volts grade to be laid in heavy gauge PVC conduit pipe 20mm/25mm dia. (ISI Marked) recessed in wall etc., complete with powder coated/anodized concealedmetal boxes (1.6mm thick with Brass lugs) required for suitable number of modules (Modular accessories) for having Step type electronic fan regulators (two module) 100watts, bell push, 6Amp. 2/3 universal socket (shuttered), 16/20Amp. combined/ universal Socket (shuttered), 6/10Amp. Switches,16/20Amp.switches with indicator etc. and covered with Frame Plate etc., PVC connector (For Fan Box and Call Bell), Steel Hooks, Sheet metal fan box (1.6mm thick shape hexagonal), Circular junction Boxes ( Fourway PVC1½\\"deep for walls and CI 3\\"deep for ceiling), bonding to earth with PVC insulated copper conductor singlecore FR cable (ISImarked) 1sq.mm, 1100volts grade (For 6Amp. wall socket & plug control point) and other petty material etc., including the cost of above material, cutting and filling up of chases (with finishing the surface): d)- Wiring 6Amp. wall socket point.
19RECESSED PVC CONDUIT PIPE WIRING SYSTEM WITH MODULAR SWITCHES:: Wiring in PVC insulated copper conductor single core FR cable (ISI marked) overall 1.5sq. mm, 1100volts grade to be laid in heavy gauge PVC conduit pipe 20mm/25mm dia. (ISI Marked) recessed in wall etc., complete with powder coated/anodized concealedmetal boxes (1.6mm thick with Brass lugs) required for suitable number of modules (Modular accessories) for having Step type electronic fan regulators (two module) 100watts, bell push, 6Amp. 2/3 universal socket (shuttered), 16/20Amp. combined/ universal Socket (shuttered), 6/10Amp. Switches,16/20Amp.switches with indicator etc. and covered with Frame Plate etc., PVC connector (For Fan Box and Call Bell), Steel Hooks, Sheet metal fan box (1.6mm thick shape hexagonal), Circular junction Boxes ( Fourway PVC1½\\"deep for walls and CI 3\\"deep for ceiling), bonding to earth with PVC insulated copper conductor singlecore FR cable (ISImarked) 1sq.mm, 1100volts grade (For 6Amp. wall socket & plug control point) and other petty material etc., including the cost of above material, cutting and filling up of chases (with finishing the surface): e)- Wiring 16/20Amp. power plug control point.
20Providing and fixing 110 mm dia. U.P.V.C Rain water pipe of 4kgf./sqm as per IS:4985 including jointing during masonary complete as per specifications and to the entire satisfaction ofEngineer -in- charge.
21Providing and fixing vitreous chinaware pedestal of approved make (to the approval of Engineer-in-charge) for wash hand basin complete in all respect. Vitreous chinaware standard white pedestal for wash hand basin.
22Providing and fixing in position Chinaware Indian Orisa water closet size 580x440 mm of approved make (to the approval of the Engineer-in-charge) consisting of 10 ltr. PVC flushing cistern ISI makred including cost of PVC long bend 32 mm dia complete in all respect and to the entire satisfaction of Engineer-in-charge.
23Providing and fixing in position singel socket SWR UPVC soil waste or antisyphonage pipes as per IS 13592 of E.D.C manufacture or of any other reputed firm including cutting, jointing, wastage, but excluding cost of jointing. Single Socket Type A (b) 110mm o/d single socket SWR UPVC pipe lines laid complete
24Providing & placing in position on terrace (at all floor levels) HDPE water storage tanks of approved make (to the approval of Engineer-in charge) with cover with suitable locking arrangement and making necessary holes for inlet,outlet and over flopipes but without fittings and base support for tank.(i) Triple Layer Tanks
25Gantry Crane for Pump house i/c Fabrication/erection: Welded plate box double girders,end carriages, seismic devices, walkways5T open winch trolley, electric wire rope hoist, motors,brakes, safety panel, overload limiter (5 m lift)QU100/QU120 heavy rails, complete fixing/aligning(43m runwayElectrical: Control panel, festoon/C track, cabling,earthing, limit switches, alarm, lightingFoundation bolts, baseplates, seismic anchoragesComplete Installation of allied items such as walkwaystaircase etc. along with commissioning and load testcomplete in all respect
26Plain cement concrete M-10 (1:3:6) nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
27Sand Filling in Foundation trenches as per Drawing and Technical Specification for 1 m cushion
28Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marked as per IS code IS458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed.The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc. R.C.C. Pipe NP -3 Dia 700mm
29Reinforced cement concrete grade M-20 in sub-structure complete as per drawing and Technical specifications using Batching plant,transit mixer and concrete pump (height upto 5m)
30Filling stones or spall into crates and hand packing
31Weaving wire netting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh
32Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
33Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification
34Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes.
35Cement concrete lining 75 mm thick or less with mechanical paver for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km.
36Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (forCoping, Transverse Sleepers, Toe Wall (Longitudinal), )
37Earthwork for compaction in 20 cm layers and dressing.Extra for watering the earth.Extra for rolling to specifications.
38Dressing of earthwork New work or remodeling work
39Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
40Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above1.5 mtr depth but upto 3.0 m
41Applying priming coat with cement primer in all shade on newly plastered or concrete exterior surface (for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.
42Providing & laying 250 mm wide LDPE Film 150 micron over sleepers
43Excavation in soil using hydraulic JCB and Hydraulic Tractors Trolley i.e cutting & loading in trolley and transporting to the embankment location with all lifts and lead.( Disposal/carrige from 3kms) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 54386827
AUTHORITY Government Departments
TENDER VALUE 3.80 Crore
LAST DATE 23-07-2026
Authority
Authority Name Water Resources Department
Work Description Tender for Construction Of Pump House And Control Room, Construction Of Sump Well, Lining Of Sirhind Canal And Neelon Drain, Construction Of Protection Works At Outfall Of Riser Main, And Joining Of Np3 700 Mm Dia Pipe With Sump Well For Construction Of Surface Pumps For Lifting Water From Sirhind Canal At Rd 145700/R Into Neelon Drain ( Civil Work )
Basic Detail
Tender No 662/6A
Bidding Type Tender
Location
City Ludhiana
State Punjab
Key Dates
Publish Date 17 Jul 2026
Submission Date 23 Jul 2026
Open Date 23 Jul 2026
Finance
Tender Value 3.80 Crore
Tender Fee 2000
EMD 7.61 Lakhs
Exemption Not Available
Document List
37d8ab61-7cef-48db-b067-83270225e0b5.html
BOQ_329577.xls
Tendernotice_1 (1).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 17, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 14, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 16, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 14, 2026
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 14, 2026
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 16, 2026
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 19, 2026
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 16, 2026
18:00 IST

Corrigendum-9 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 14, 2026
18:00 IST

Corrigendum-10 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 20, 2026
18:00 IST

Corrigendum-11 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 21, 2026
18:00 IST

Corrigendum-12 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 19, 2026
18:00 IST

Corrigendum-13 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-14 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 20, 2026
18:00 IST

Corrigendum-15 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 19, 2026
18:00 IST

Corrigendum-16 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 16, 2026
18:00 IST

Corrigendum-17 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-18 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 24, 2026
18:00 IST

Corrigendum-19 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 21, 2026
18:00 IST

Corrigendum-20 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 20, 2026
18:00 IST

Corrigendum-21 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 19, 2026
18:00 IST

Corrigendum-22 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 17, 2026
18:00 IST

Corrigendum-23 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-24 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 02, 2026
18:00 IST

Corrigendum-25 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 01, 2026
18:00 IST

Corrigendum-26 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 07, 2026
18:00 IST

Corrigendum-27 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-28 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 02, 2026
18:00 IST

Corrigendum-29 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 01, 2026
18:00 IST

Corrigendum-30 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 10, 2026
18:00 IST

Corrigendum-31 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 09, 2026
18:00 IST

Corrigendum-32 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 07, 2026
18:00 IST

Corrigendum-33 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 09, 2026
18:00 IST

Corrigendum-34 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 07, 2026
18:00 IST

Corrigendum-35 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 06, 2026
18:00 IST

Corrigendum-36 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 16, 2026
18:00 IST

Corrigendum-37 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-38 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 10, 2026
18:00 IST

Corrigendum-39 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 09, 2026
18:00 IST

Corrigendum-40 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-41 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 09, 2026
18:00 IST

Corrigendum-42 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 10, 2026
18:00 IST

Corrigendum-43 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 07, 2026
18:00 IST

Corrigendum-44 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 27, 2026
18:00 IST

Corrigendum-45 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-46 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 24, 2026
18:00 IST

Corrigendum-47 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 21, 2026
18:00 IST

Corrigendum-48 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-49 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 24, 2026
18:00 IST

Corrigendum-50 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 21, 2026
18:00 IST

Corrigendum-51 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 20, 2026
18:00 IST

Corrigendum-52 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 19, 2026
18:00 IST

Corrigendum-53 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 01, 2026
18:00 IST

Corrigendum-54 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 30, 2026
18:00 IST

Corrigendum-55 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 27, 2026
18:00 IST

Corrigendum-56 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 30, 2026
18:00 IST

Corrigendum-57 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 25, 2026
18:00 IST

Corrigendum-58 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 27, 2026
18:00 IST

Corrigendum-59 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 24, 2026
18:00 IST

Corrigendum-60 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 21, 2026
18:00 IST

Corrigendum-61 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 20, 2026
18:00 IST

Corrigendum-62 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 17, 2026
18:00 IST

Corrigendum-63 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 22, 2026
18:00 IST

Corrigendum-64 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 20, 2026
18:00 IST

Corrigendum-65 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 17, 2026
18:00 IST

Corrigendum-66 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 16, 2026
18:00 IST

Corrigendum-67 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 28, 2026
18:00 IST

Corrigendum-68 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 23, 2026
18:00 IST

Corrigendum-69 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 22, 2026
18:00 IST

Corrigendum-70 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 20, 2026
18:00 IST

Corrigendum-71 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 17, 2026
18:00 IST

Corrigendum-72 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 16, 2026
18:00 IST

Corrigendum-73 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 13, 2026
18:00 IST

Corrigendum-74 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 22, 2026
18:00 IST

Corrigendum-75 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 20, 2026
18:00 IST

Corrigendum-76 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 27, 2026
18:00 IST

Corrigendum-77 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 23, 2026
18:00 IST

Corrigendum-78 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 27, 2026
18:00 IST

Corrigendum-79 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 23, 2026
18:00 IST

Corrigendum-80 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 04, 2026
18:00 IST

Corrigendum-81 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 30, 2026
18:00 IST

Corrigendum-82 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 29, 2026
18:00 IST

Corrigendum-83 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 28, 2026
18:00 IST

Corrigendum-84 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 25, 2026
18:00 IST

Corrigendum-85 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 22, 2026
18:00 IST

Corrigendum-86 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 25, 2026
18:00 IST

Corrigendum-87 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 29, 2026
18:00 IST

Corrigendum-88 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 28, 2026
18:00 IST

Corrigendum-89 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 22, 2026
18:00 IST

Corrigendum-90 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 20, 2026
18:00 IST

Corrigendum-91 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 18, 2026
18:00 IST

Corrigendum-92 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 15, 2026
18:00 IST

Corrigendum-93 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 13, 2026
18:00 IST

Corrigendum-94 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 14, 2026
18:00 IST

Corrigendum-95 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 12, 2026
18:00 IST

Corrigendum-96 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 22, 2026
18:00 IST

Corrigendum-97 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 20, 2026
18:00 IST

Corrigendum-98 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 18, 2026
18:00 IST

Corrigendum-99 Issued

Clarifications on tender conditions and amendments issued.

Completed
May 15, 2026
18:00 IST

Corrigendum-100 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Jul 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
html

37d8ab61-7cef-48db-b067-83270225e0b5.html

xls

BOQ_329577.xls

pdf

Tendernotice_1 (1).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders