| 1 | NOTE:- Schedule ‘A’ (Part- I) under Ser No.1.01 to 1.07. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only.The estimated rate is left blank since the same is not prepriced by MES |
| 2 | Construction of Toilet Block Building having IWC (03 Nos), WHB (03 Nos), Bath Room (02 Nos), Urinal (02 Nos) with RCC framed structure, Brick Masonary, RCC roof slab etc. complete all as specified and as shown on drawings.(NEAR T-241) |
| 3 | Construction of Toilet Block Building having IWC (03 Nos), WHB (03 Nos), Bath Room (02 Nos), Urinal (02 Nos) with RCC framed structure, Brick Masonery, RCC roof slab etc. complete all as specified and as shown on drawings. (NEAR T-243) |
| 4 | Construction of Toilet Block Building having IWC (05 Nos), WHB (05 Nos), Bath Room (04 Nos), Urinal (03 Nos) with RCC framed structure, Brick Masonary, RCC roof slab etc. complete all as specified and as shown on drawings. (NEAR P-611) |
| 5 | Construction of Toilet Block Building having IWC (14 Nos), WHB (08 Nos), Bath Room (14 Nos), Urinal (08 Nos) with RCC framed structure, Brick Masonary, RCC roof slab etc (In double storeyed ) complete all as specified and as shown on drawings. (NEAR P-425) |
| 6 | Construction of Toilet Block Building having IWC (04 Nos), WHB (03 Nos), Bath Room (03 Nos), Urinal (02 Nos) with RCC framed structure, Brick Masonary, RCC roof slab etc. complete all as specified and as shown on drawings. (NEAR TD BILLETS SQDN) |
| 7 | Construction of Toilet Block Building having IWC (09 Nos), WHB (05 Nos), Bath Room (08 Nos), Urinal (06 Nos) with RCC framed structure, Brick Masonary, RCC roof slab etc. complete all as specified and as shown on drawings (NEAR P-257) |
| 8 | Construction of Toilet Block Building having IWC (04 Nos), WHB (03 Nos), Bath Room (03 Nos), Urinal (02 No) with RCC framed structure, Brick Masonary, RCC roof slab etc. complete all as specified and as shown on drawings. (NEAR TD BILLETS) |
| 9 | NOTE:- Schedule ‘A’ Part- II to X. Ser No. 2.00 to 10.00 are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. |
| 10 | Lump sum price worked out by the Contractor for Internal electrification as listed in Sch 'A' Part- II |
| 11 | Lump sum price worked out by the Contractor for Internal Water Supply as listed in Sch `A’ Part- III |
| 12 | Lump sum price worked out by the Contractor for Road/Path as listed in Sch 'A' Part -IV |
| 13 | Lump sum price worked out by the Contractor for Sewage Disposal as listed in Sch `A’ Part V. |
| 14 | Lump sum price worked out by the Contractor for External Water Supply as listed in Sch `A’ Part- VI |
| 15 | Lump sum price worked out by the Contractor for External Electrification as listed in Sch `A’ Part - VII |
| 16 | Lump sum price worked out by the Contractor for Hot Water Supply as listed in Sch `A’ Part -VIII |
| 17 | Lump sum price worked out by the Contractor for Site Development as listed in Sch `A’ Part -IX. |
| 18 | Lump sum price worked out by the Contractor for Demolition and Dismantling Work as listed in Sch `A’ Part -X. |
| 19 | SCHEDULE 'A' PART - XI (MISC ITEMS)Note for items 12 to 21 :- The contractor shall quote his rate for each of these items separately. The estimated rate is left blank since the same is not prepriced by MES) |
| 20 | S&F for LED tube light fitting 4' long, 20/18 Watt single phase 230 V with illumination efficiency more than 120 Lumen/Watt, 3000K/6000K, decorative tuneable white browse through mood changing colour options type slim ultra bright LED polycarbonate tube fixture with extruded heat shrink, environmental friendly energy efficientwith very high efficiency to give glare free light at light source incl integrated electronic driver complete all as specified and directed. Make: CG/Havells/Philips |
| 21 | S&F for Light mirror light fitting 2' long, 10/20 Watt single phase 230 V with illumination efficiency more than 120 Lumen/Watt, 3000K/6000K, decorative tuneable white browse through mood changing colour options type slim ultra bright LED polycarbonate tube fixture with extruded heat shrink, environmental friendly energy efficientwith very high efficiency to give glare free light at light source incl integrated electronic driver complete all as specified and directed. |
| 22 | M & L for construction of valve chamber of internal size 0.9 mtr x 0.9 mtr x 0.9 mtr with 100 mm thick PCC (1:4:8 ) type D-2 for foundation , brick walls built in cement mortor (1:4 ), PCC 1:2:4 type B1 for coping , rendering in cement mortor 1:4, 15 mm thick both internally and externally upto 15 cm below GL including provision of MS sheet cover using angle iron 50 x 50 x 6 mm as a frame embedded in concrete and 3 mm thick MS sheet as in cover with necessary locking arrangements duly painted with two coats of synthetic enamel paint over a coat of red oxide primer and two coats of white wash after preparation of surafces including necessary earth work and excavation complete all as specified and directed. |
| 23 | M & L for construction of valve chamber of internal size 0.6 mtr x 0.6 mtr x 0.6mtr with 100 mm thick PCC (1:4:8 ) type D-2 for foundation , brick walls built in cement mortor (1:4 ), PCC 1:2:4 type B1 for coping , rendering in cement mortor 1:4, 15 mm thick both internally and externally upto 15 cm below GL including provision of MS sheet cover using angle iron 50 x 50 x 6 mm as a frame embedded in concrete and 3 mm thick MS sheet as in cover with necessary locking arrangements duly painted with two coats of synthetic enamel paint over a coat of red oxide primer and two coats of white wash after preparation of surafces including necessary earth work and excavation complete all as specified and directed. Please Enable Macros to View BoQ information |
| 24 | M & L for construction of valve chamber of internal size 0.6 mtr x 0.6 mtr x 0.6mtr with 100 mm thick PCC (1:4:8 ) type D-2 for foundation , brick walls built in cement mortor (1:4 ), PCC 1:2:4 type B1 for coping , rendering in cement mortor 1:4, 15 mm thick both internally and externally upto 15 cm below GL including provision of MS sheet cover using angle iron 50 x 50 x 6 mm as a frame embedded in concrete and 3 mm thick MS sheet as in cover with necessary locking arrangements duly painted with two coats of synthetic enamel paint over a coat of red oxide primer and two coats of white wash after preparation of surafces including necessary earth work and excavation complete all as specified and directed. Please Enable Macros to View BoQ information |