| 1 | Water Supply arrangement at Different Locations by Installation of DTW by DTH Rig ( 1250 feet) |
| 2 | Source Development by Installing Deep Tube Well (DTH Rig ) of Size 200 MM of 1250 Feet Depth as per specification and as directed. |
| 3 | Providing,laying and fixing of GI distribution pipe line with a length of 250 Mtr as per specification and as directed. |
| 4 | Providing,laying and fixing of GI distribution pipe line including construction of Valve Chamber etc. with a length of 1600 Mtr as per drawing and specification |
| 5 | Construction of 8.0 Mtr MS staging ESR with Sysntex tanks of 2000 Ltr Capacity as per drawing and specification |
| 6 | Construction of 16 Mtr MS staging ESR with GRP tanks of 20000 Ltr Capacity as per drawing and specification |
| 7 | Providing , supplying ,Installaion, fitting and fixing testing and commissioning of 7.5 HP Submersible Pump Set |
| 8 | Laying of raw water pumping main from DTW to Pressure Filter Unit as per Specifications and IS codes. |
| 9 | Installation of Iron Removal Pressure Filters of 5000 liters/hr capacity as per Specification |
| 10 | Installation of Iron Removal Pressure Filters of 15000 liters/hr capacity as specification |
| 11 | Construction of Functional Household Tap Connection including earthwork in excavation for pipe line (both for connection in distribution line and service connection) and refilling, dressing etc., providing PVC Saddle Pieсе of average size 110 mm x 15 mm (i.e. ranging from 63mm to 140mm) and make Supreme or equivalent, making holes in the distribution pipe,providing 15 mm dia bronze ferrule cock (PN-16) conforming to IS:2692 (1989) as ammended and make Zoloto or equivalent, connecting it to the saddle piece, providing and fixing 3 layer (Outer green / GREY coloured UV Stabilised, middle black coloured UV Stabilised and inermost layer white coloured with antimicrobial property) Fusion welded PP- R ( Poly propylene-random copolymer) Pipes, SDR 7.4 having thermal stability for hot and cold water supply conforming IS 15801-2008 of length 10m from saddle piece to the tap point ( pipes of make SFMC/FUSION/Wetflow, Kisan brand or other brand of equivalent quality and PN 16 Pipe,20 mm OD,SDR-7.4) including all plain PP-R fittings and brass threaded PP-R fitting and clamping, cutting and making good to the damages, including all taxes and duties as applicable and including the cost of all required labour and materials as directed and specified. The item also inludes construction and installation of R.C.C Hydrant Pillar of size 100mm x 100 mm, height 1200 mm with 6 mm dia bar embeded to RCC Post in proportion 1:1.5:3 with 4 nos 10 mm dia main and 6 mm dia stirrup @ 150 C/c and fixing 15 mm dia PPR pipe to the hydrant, with 6 mm rings embedded in concrete for anchoring inclusive of cost of transportation to site and also supplying fitting and fixing PVC Bib cock all complete as directed and specified. Approved good for construction drawing will be issued by the deptt. |
| 12 | Providing,laying, testing and commissioning of clear water pumping main as per specification |
| 13 | Cost of subsoil survey for construction of ESR |
| 14 | Supplying,fitting & fixing of Bulk Flow Meter as per specification and make approved by APHE |
| 15 | Construction of fencing as per drawing and as directed by Deptt. |
| 16 | Development of project site |
| 17 | Power connection from APDCL Pole to Box system panel board and electrification etc. |
| 18 | Supply and installtion of Sign Board |
| 19 | Water Supply arrangement at Different Locations by Installation of DTW by DTH Rig ( 800 feet) |
| 20 | Source Development by Installing Deep Tube Well (DTH Rig ) of Size 200mm (DTH Rig) of 800 feet as per specification |
| 21 | Providing,laying and fixing of GI distribution pipe line with a length of 250 Mtr as per specification and as directed. |
| 22 | Providing,laying and fixing of GI distribution pipe line including construction of Valve Chamber etc. with a length of 1600 Mtr as per drawing and specification |
| 23 | Construction of 8.0 Mtr MS staging ESR with Sysntex tanks of 2000 Ltr Capacity as per drawing and specification. |
| 24 | Construction of 16.00 Mtr MS staging ESR with GRP tanks of 20000 Ltr Capacity as per drawing and specification. |
| 25 | Providing,supplying ,Installaion, fitting and fixing testing and commissioning of 5.0 HP Submersible Pump Set |
| 26 | Laying of raw water pumping main from DTW to Pressure Filter Unit as per Specification and IS codes. |
| 27 | Installation of Iron Removal Pressure Filters of 5000 liters/hr capacity |
| 28 | Installation of Iron Removal Pressure Filters of 15000 liters/ hr capacity as per specification |
| 29 | Cost of subsoil survey for construction of ESR |
| 30 | Providing,laying, testing and commissioning of clear water pumping main as per specification |
| 31 | Construction of Functional Household Tap Connection including earthwork in excavation for pipe line (both for connection in distribution line and service connection) and refilling, dressing etc., providing PVC Saddle Pieсе of average size 110 mm x 15 mm (i.e. ranging from 63mm to 140mm) and make Supreme or equivalent, making holes in the distribution pipe,providing 15 mm dia bronze ferrule cock (PN-16) conforming to IS:2692 (1989) as ammended and make Zoloto or equivalent, connecting it to the saddle piece, providing and fixing 3 layer (Outer green / GREY coloured UV Stabilised, middle black coloured UV Stabilised and inermost layer white coloured with antimicrobial property) Fusion welded PP- R ( Poly propylene-random copolymer) Pipes, SDR 7.4 having thermal stability for hot and cold water supply conforming IS 15801-2008 of length 10m from saddle piece to the tap point ( pipes of make SFMC/FUSION/Wetflow, Kisan brand or other brand of equivalent quality and PN 16 Pipe,20 mm OD,SDR-7.4) including all plain PP-R fittings and brass threaded PP-R fitting and clamping, cutting and making good to the damages, including all taxes and duties as applicable and including the cost of all required labour and materials as directed and specified. The item also inludes construction and installation of R.C.C Hydrant Pillar of size 100mm x 100 mm, height 1200 mm with 6 mm dia bar embeded to RCC Post in proportion 1:1.5:3 with 4 nos 10 mm dia main and 6 mm dia stirrup @ 150 C/c and fixing 15 mm dia PPR pipe to the hydrant, with 6 mm rings embedded in concrete for anchoring inclusive of cost of transportation to site and also supplying fitting and fixing PVC Bib cock all complete as directed and specified. Approved good for construction drawing will be issued by the deptt. |
| 32 | Supplying,fitting & fixing of Bulk Flow Meter as per specification and make approved by APHE |
| 33 | Construction of fencing as per drawing and as directed by Deptt. |
| 34 | Development of project site |
| 35 | Power connection from APDCL Pole to Box system panel board and electrification etc. |
| 36 | Supply and installtion of Sign Board |
| 37 | Water Supply arrangement at Different Locations by Installation of DTW by Rotary Rig |
| 38 | Installation of 200x200 mm dia Deep Tube Well of UPVC casing by drilling with Rotary Rig |
| 39 | Providing,laying and fixing of GI distribution pipe line with a length of 275 Mtr as per specification and as directed. |
| 40 | Providing,laying and fixing of GI distribution pipe line including construction of Valve Chamber etc. with a length of 1600 Mtr as per drawing and specification |
| 41 | Construction of 8.0 Mtr MS staging ESR with Sysntex tanks of 2000 Ltr Capacity as per drawing and specification. |
| 42 | Construction of 16.00 Mtr MS staging ESR with GRP tanks of 20000 Ltr Capacity as per drawing and specification. |
| 43 | Providing , supplying ,Installaion, fitting and fixing testing and commissioning of 3.0 HP Submersible Pump Set |
| 44 | Laying of raw water pumping main from DTW to Pressure Filter Unit as per Specification and IS codes |
| 45 | Installation of Iron Removal Pressure Filters of 5000 liters/hr capacity |
| 46 | Installation of Iron Removal Pressure Filters of 15000 liters / hr capacity |
| 47 | Providing,laying, testing and commissioning of clear water pumping main as per specification |
| 48 | Cost of subsoil survey for construction of ESR |
| 49 | Supplying,fitting & fixing of Bulk Flow Meter as per specification and make approved by APHE |
| 50 | Construction of Functional Household Tap Connection including earthwork in excavation for pipe line (both for connection in distribution line and service connection) and refilling, dressing etc., providing PVC Saddle Pieсе of average size 110 mm x 15 mm (i.e. ranging from 63mm to 140mm) and make Supreme or equivalent, making holes in the distribution pipe,providing 15 mm dia bronze ferrule cock (PN-16) conforming to IS:2692 (1989) as ammended and make Zoloto or equivalent, connecting it to the saddle piece, providing and fixing 3 layer (Outer green / GREY coloured UV Stabilised, middle black coloured UV Stabilised and inermost layer white coloured with antimicrobial property) Fusion welded PP- R ( Poly propylene-random copolymer) Pipes, SDR 7.4 having thermal stability for hot and cold water supply conforming IS 15801-2008 of length 10m from saddle piece to the tap point ( pipes of make SFMC/FUSION/Wetflow, Kisan brand or other brand of equivalent quality and PN 16 Pipe,20 mm OD,SDR-7.4) including all plain PP-R fittings and brass threaded PP-R fitting and clamping, cutting and making good to the damages, including all taxes and duties as applicable and including the cost of all required labour and materials as directed and specified. The item also inludes construction and installation of R.C.C Hydrant Pillar of size 100mm x 100 mm, height 1200 mm with 6 mm dia bar embeded to RCC Post in proportion 1:1.5:3 with 4 nos 10 mm dia main and 6 mm dia stirrup @ 150 C/c and fixing 15 mm dia PPR pipe to the hydrant, with 6 mm rings embedded in concrete for anchoring inclusive of cost of transportation to site and also supplying fitting and fixing PVC Bib cock all complete as directed and specified. Approved good for construction drawing will be issued by the deptt. |
| 51 | Construction of fencing as per drawing and as directed by Deptt. |
| 52 | Development of project site |
| 53 | Power connection from APDCL Pole to Box system panel board and electrification etc. |
| 54 | Supply and installtion of Sign Board Please Enable Macros to View BoQ information |