|
| 1 | Servicing and Maintenance of 07 Units (104 HP) of VRV Hot and Cold Air Conditioner |
| 2 | Repairing of PCB for VRV Type. |
| 3 | Recharging of Gas to VRV AC with necessary fillings with refrigrant as suitable as per direction of Engineer In Charge.. |
| 4 | Servicing of spilit AC inverter / non inverter type in the prescribed period with necessary equipment and as per direction of Engineer-in-charge. |
| 5 | Servicing of Cassetee AC 3.00 TON inverter / non invertor type in the prescribed period with necessary equipment and as per direction of Engineer-in-charge. |
| 6 | Servicing of window AC inverter / non inverter type in the prescribed period with necessary equipment and as per direction of Engineer-in-charge. |
| 7 | Supply and recharging of gas in all AC Unit ( Window/Split/Cassette ) with necessary fillings with refrigerant as suitable as per direction of Engineer In Charge. |
| 8 | Replacement of running capacitor /Contactor to the Air Conditioner as approved and as per direction Engineer In Charge.. |
| 9 | Replacement of Indoor Blower of Air Conditioner with suitable and screwing etc as per direction of Engineer In Charge. |
| 10 | Replacement of Non Invertor AC outdoor Motor as per approved and as directed by Engineer in Charge. |
| 11 | Providing and fixing PVC Drain Pipe as per direction of Engineer In Charge. |
| 12 | Replacement of Outdoor Fan Blade as per direction of Engineer In charge.. |
| 13 | Dismateling and Re-Installtion of Split Type AC/Window AC as per direction of Engineer In Charge.. |
| 14 | Supplying and Installation of Copper Pipe with Insulation along with Casing and Capping as per direction of Engineer In Charge. |
| 15 | Wiring with 3 / 4 core x 2.5sqm wire to suitable and required AC approved as per direction Engineer in Charge. |
| 16 | Gas topup in splite/Window/Cassette type AC |
| 17 | Supplying and Replacement of Water Pump for Cassette type AC as per direction Of Engineer In Charge. |
| 18 | SITC of compressor capacity of 1.5 Ton Air Conditioners including removing of defective compressor complete as per direction of Engineer-in-charge. |
| 19 | SITC of compressor capacity of 2.0 Ton Air Conditioners including removing of defective compressor complete as per direction of Engineer-in-charge. |
| 20 | SITC of cooling coil complete as per direction of Engineer-in-charge. |
| 21 | SITC of Condenssor coil complete as per direction of Engineer-in-charge. |
| 22 | SITC of Printed Circuit Board (PCB) non inverter AC complete as per direction of Engineer-in-charge. |
| 23 | Remote for Split/Cassette/Window AC of approved brand as per direction of Engineer In Charge. |
| 24 | Repairing of AC PCB for Split / Cassette type Non Invertor type AC as per direction of Engineer In Charge. Please Enable Macros to View BoQ information |