| 1 | Work description |
| 2 | Installation of NGR in GEC make 3.3KV/550V TSU along with repairing of Primary switch gear installed at 17/18Drift 21Level (Sl.No.D1123244) Introduction of restricted neutral system NGR with requiring spares |
| 3 | Supply and fixing of shunt trip coil assembly complete with trip coil etc. |
| 4 | Supply and fixing of Micro switch (Test-reset) |
| 5 | 110Volt auxillary circuit wiring with 2.55qmm multistrand copper wire, lugs, ferrule etc. |
| 6 | Unit portion cleaning and re-insulating with HT grade varnish etc. |
| 7 | Repairing of closing and tripping mechanism |
| 8 | Labour charges for assembling, fitting, testing etc. |
| 9 | Fabrication of M.S. Box |
| 10 | B) Installation of NGR in GEC make 3154KVA 3.3KV/550Volt TKSU along with repairing c switch gear installed at 5Drift 17Rise (Sl.No. 371078/1) Introduction of restricted neutral system NGR with requiring spares |
| 11 | Supply and tixing of shunt trip coil assembly complete with trip coll etc. |
| 12 | 110Volt auxiliary circuit wiring with 2.55qmm multistrand copper wire, lugs, ferrule etc. |
| 13 | Unit portion cleaning and re-insulating with HT grade varnish etc. |
| 14 | Repairing of closing and tripping mechanism |
| 15 | Labour charges for assembling, fitting, testing etc. |
| 16 | Fabrication of M.5. Box |
| 17 | ( C)Installation of NGR in Andrewyule make 315KVA 3.3KV/550V TSU SL.No.TSU/M/03 Inst R 30Drift Introduction of restricted neutral system NGR with requiring spares |
| 18 | Supply and fixing of shunt trip coil assembly complete with trip coil etc. |
| 19 | Supply and fixing of Micro switch (Test-reset) |
| 20 | 110Volt auxiliary circują wiring with 2.55qmm multistrand copper wire, fugs, ferrule etc.. |
| 21 | Unit portion cleaning and re-insulating with HT grade varnish etc. |
| 22 | Labour charges for assembling, fitting, testing etc. |
| 23 | Fabrication of M.S. Box |
| 24 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |