| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (a)all kinds of soil. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. a) All kinds of soil |
| 3 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 12.5 mm nominal size derived from natural sources) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(a) 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(a) 1:5:10 (1 cement : 5 coarse sand (zone-lll) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: a) Foundations, footings, bases of columns, etc. for mass concrete |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: a) Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of classb designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :(a) Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 9 | 12 mm cement plaster of mix : (a) 1:6 (1 cement: 6 fine sand) |
| 10 | 15 mm cement plaster on the rough side of single or half brick wall of mix :(a) 1:6 (1 cement: 6 fine sand) |
| 11 | 6 mm plaster on cement concrete or reinforced cement concrete work with white cement based polymer modified self curing mortar of approved maken as per the direction of Engineer-In-Charge. |
| 12 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar |
| 13 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per 1S: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in 110% of the specified minimum cement content, discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level (a)Concrete of M25 grade with minimum cement content of 330 kg /cum |
| 14 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per 1S: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in 110% of the specified minimum cement content, discretion to either re-design the mix or bear the cost of extra cement.All works above plinth level upto floor V level : a) Concrete of M25 grade with minimum cement content of 330 kg /cum |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form for (a) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form for (a) Suspended floors, roofs, landings, balconies and access platform |
| 17 | Steel reinforcement for R.C.C. work including straightening, cutting bending, placing in position and binding all complete upto plinth level.(a)Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 18 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. A) Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 19 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 20 | Finishing walls with water proofing cement paint of required shade :(a) New work (Two or more coats applied @ 3.84 kg/10 sqm) sqm 116.90 |
| 21 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour :(a) New work (two or more coats) over and including water thinnable priming coat with cement primer having VOC content less than 50 gram/litre |
| 22 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 23 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. |
| 24 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade (a) Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture |
| 25 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 26 | \\"Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 27 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.(a)Hot finished welded type tubes |
| 28 | Providing and fixing 1 mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer(a) Using M.S. angels 40x40x6 mm for diagonal braces |
| 29 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level(a)All types of soil ,400 mm dia |
| 30 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level.(a) Rocky strata including Boulders, 400 mm dia |
| 31 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories , 150 mm nominal size dia |
| 32 | Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge., 150 mm nominal size dia. |
| 33 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. |
| 34 | Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineerin- charge. |
| 35 | Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer -in-charge. |
| 36 | Gravel packing in tubewell construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineerin-in-charge |
| 37 | Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all complete for borewell of:(a) 150 mm dia |
| 38 | Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required size complete.(a) 150 mm clamp |
| 39 | Providing and fixing Bail plug/ Bottom plug of required dia to the bottom of pipe assembly of tubewell as per IS:2800 (part I).(a) 150 mm dia |
| 40 | Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS : 8329 a) 150 mm dia Ductile Iron Class K-9 pipes |
| 41 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. A) Nominal concrete 1:3:6 or richer mix (including equivalent design mix) |
| 42 | Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : a) 100 mm diameter 150 mm diameteri) Class I each 6966.5 |
| 43 | Providing structural design for 02Nos. Of sump pit and pump house form an approved Structural Consultant. The Structural Consultant shall be from approved list of DDA or any other Government Department, all complete including submission of 03 sets of drawings duly signed by the approved Structural Consultant. |
| 44 | Add cost index @3% on Rs. 4266154.35 of DSR item 1 to 42 |
| 45 | Apply GST Correction Factor @0.973, except on item no. 43 Please Enable Macros to View BoQ information |