| 1 | Item No.1:- Providing ISI standard RCC pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, including all statutary duties and taxes such as GST levied by Gol and GoM in all respect, inspection charges, transport to departmental stores / site, unloading and stacking, etc. complete as per IS -458/1988. Note One collar sl puld be supplied with each full length plain ended RCC pe, cost including in rates below. One rubber ring should be supplied with each full length of socketed pipe, cost including in rates below.(450 mm Dia RCC NP II Class Pipe) MJP DSR 2023-24,P-109,I- 1. |
| 2 | Item No.2 :- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel, soft murum, hard murum, hard murum and boulders, including removing the excavated material upto a distance of 50 mtrs. beyond the area and lifts as below, stacking as directed by Engineer - in-charge, normal dewatering, excluding backfilling, etc. complete by all means.MJP DSR 2023-24, Page-37,38 Item No.1,2,3,5,7[(165+187+211)/3 + 10% for hilly area] |
| 3 | Item No.3:- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel, soft murum, hard murum, hard murum and boulders, including removing the excavated material upto a distance of 50 mtrs. beyond the area and lifts as below, stacking as directed by Engineer - in - charge, normal dewatering, excluding backfilling, etc. complete by all means.MJP DSR 2023-24, Page-37,38 Item No.1,2,3,5,7 [(629+831+1119)/3 + 10% for hilly area) |
| 4 | Item No.4:- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete.(Rs. 92.00 + 10% for hilly area)(MJP DSR 2023-24, P-40, I-16) |
| 5 | Item No.5:- Lowering, laying and jointing in proper grade and alignment RCC pipes with collar joints in CM 1:1 proportion or socketed RCC pipes with rubber joints ( excluding cost of rubber ring or RCC collar), including cost of conveyance from stores to site of works, cost of jointing material, labour, giving hydraulic testing, etc. complete as directed by Engineer - in - charge as per IS 783-1985.450 mm dia. RCC NP II class pipe |
| 6 | Item No.6:- Providing and constructing B.B. masonry circular manhole chamber without conical shape excluding excavation, RCC1:2:4 proportion, 20 cm bedding in brick masonry CM1:4proportion, 23cmthickfor2Mdepthfromtop, etc.complete as directed by Engineer - in - charge. Chamber of 1M Depth (MJP DSR 2023-24) |
| 7 | Item No. 7:- Providing and laying in situ cement concrete M-150 of trap / granite / qurtzite/gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc.complete.PCC M-150(MJP DSR 2023-24, P-47,1-1)(Rs. 5881.00+ 10% for hilly area) |
| 8 | Item No. 8:- Refilling the trenches with available excavated stuff with soft material first over pipe line and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete.(Rs. 92.00 + 10% for hilly area)(MJP DSR 2023-24, P-40, 1-16) |
| 9 | Item No. 9:- Disposal of excavated stuff about 3km including loading, unoading, transportation etc.complete.(MJP DSR 2023-24, P-29, Statement IV) Please Enable Macros to View BoQ information |