|
| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. |
| 2 | Excavation pit size 0.75 x 0.75 x 0.75 m for planting large flowering/ shady trees in earth, soil of all types, soft murum, including removing the excavated & unwanted material up to a required distance of 50 mtrs. |
| 3 | FARM YARD MANURE:-Supplying on site well decayed, well dried, well powdered, without clods and free from stones, dried grass and other rubbish material. The color of the manure generally is black. The manure will be measured by measuring box.(Farma) Item includes Transporting, loading - unloading etc (.Lead charges per 20 km. considered.) |
| 4 | Mixing of available excavated good soil/silt &manure thoroughly well, watering previous night. Planting required plant species; lawn grass as directed etc. complete. (1/10 of unskilled labour i.e 648/10 + Including (Overhead Charges 10% & Contractor Profit 10% ) |
| 5 | Spreading fresh garden soil /silt & manure in excavated area including lead up to a distance of 50 Mtrs |
| 6 | Supply plants height up to 8-10 feet having Minimum 5 to 6 Branches with Maximum number of Leaves ,clear trunk, well Developed Canopy,Healthy conditionFree from pest and diseases,well seteled in appropriate size of Plybag,uniform in size and root system are undamaged. |
| 7 | Peepal |
| 8 | Kaduneem |
| 9 | Bakul |
| 10 | Silver oak |
| 11 | Arjun |
| 12 | Bahava |
| 13 | Alstonia/Satvin |
| 14 | Putranjivia |
| 15 | Karanj |
| 16 | Kadamba |
| 17 | Peltraforum, Bakan, Mohagani, Shishu, Shirish, , Jamun,umbar |
| 18 | Providing & applying chlorophyrifos / insecticide to excavated pits 20 ml per plant including labor material etc complete |
| 19 | Providing & applying of Fertilizer 100 gm DAP / Urea per plant including labor material etc complete |
| 20 | Providing fixing fabricating and Painting for tree guards structural steel work in rolled sections, fixed with connecting plates or angle cleats in main and cross beams, hip and jack rafters, purlins connecting to truss members and the like, as per detailed designs and drawing or as directed including cutting, fabricating, hoisting, erecting, fixing in position, making riveted/ bolted/ welded coneection and one coat of anticorrosive paint and over it two of oil painting of approved quality and shade etcetera complete. |
| 21 | Maintainance of Newly Planted plants varities having height 2.5 mtr. - 3 mtr. For First 30 days Only |
| 22 | Maintainance for one year of Planted Plants by the roadside (Avenue trees) including decayed farm yard / sludge manure,pesticide,watering casualty replacement etc complete. |
| 23 | Maintainance for two year of Planted Plants by the roadside (Avenue trees) including decayed farm yard / sludge manure,pesticide,watering casualty replacement etc complete. Please Enable Macros to View BoQ information |