| 1 | Dismantling plank flooring |
| 2 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. |
| 3 | Dismantling wood work from roof. |
| 4 | Dismantling stone masonry/Rubble masonry including stacking of serviceable materials and disposal of unserviceable materials. In cement |
| 5 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- Kassi work undressed involving an average horizontal throw up to 2.0 metres and anaverage vertical lift up to 0.5 metres including breaking of clods. |
| 6 | Cement concrete 1:4:8 mixing by mechanical means using concrete mixer volumetric type with stone ballast 20mm gauge |
| 7 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 550 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including binding, bending and placing in position complete |
| 8 | Centering and shuttering for columns (Square or rectangular or poly gonal in plain) |
| 9 | Reinforced cement concrete M-35 mechanically batch mixed using batch type concrete mixer as per IS:1791andvibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth |
| 10 | Reinforced cement concrete M-35mechanically batch mixed using batch typeconcrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. |
| 11 | Providing and fixing Top piller Plate @ 30mm thick 10X235.50 Kg. per Sqm. =23.55 Qtl. |
| 12 | Steel work fixed independently without connecting plates including cutting hoisting and fixing in position R S Joists |
| 13 | Steel work fixed independently without connecting plates including cutting hoisting and fixing in position Tees angles & channels |
| 14 | Random rubble masonry or polygonal rubble masonry (Kentish Rag) or random or polygonal rubble built to courses in foundations and plinth in cement mortar 1:6 |
| 15 | Applying priming coat with metal primer on new steel or iron work including preparation of surface. |
| 16 | Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade. |
| 17 | Earth work containing Gravel (in loose from in non cohesive binding material) work in excavation with occasional use of picks exclusive of compensation of earth undressed with combined lead upto 15 metres with percentage of gravel or Kankar.Exceeding 80 % but upto 100 %.200 Mtr. U/S & D/ of Bakhali Khad for diversion of water |
| 18 | Nuts & Bolts of all sizes and length required |
| 19 | Providing & Fixing Sal Wood In Plank |
| 20 | All rectangular, Square and Circular pipe hollow Sections ISI Marked |
| 21 | Steel work fixed independently without connecting plates including cutting hoisting and fixing in position c) Tees angles & channels Labour rate only |
| 22 | U Clamps for 60mm Dia Rope Fixing in Wire House |
| 23 | Loosening an tightening of 60 mm dia rope with mechanical arrangements (10 No cables) |
| 24 | Grease Wheel Bearing/Multipurpose |
| 25 | Steel Wire Rope 16mm dia Please Enable Macros to View BoQ information |