| 1 | Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site. |
| 2 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 3 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 4 | Horizontal Directional Drilling (HDD), supplying and pulling 110/125 /160 mm HDPE pipe duct for drawing 3 × 300 sq.mm Aluminium XLPE underground (UG) cable through the HDPE Pipe , including drawing, pulling, and laying of the UG cable; including route survey for identification of underground utility installations and other obstructions using suitable modern sensing equipment, pit excavation, pilot drilling, pre-reaming, reaming, and duct pulling, using bentonite or approved drilling fluid wherever necessary for bore stability and lubrication; cable pulling, backfilling and closing of pits with normal soil and proper consolidation or by any method as directed by the Department Authorities, without causing damage to existing utility services; supplying and providing route markers at 100m intervel and providing danger/caution boards as per the directions of Department Officers, etc |
| 5 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 6 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 7 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 8 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 9 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 10 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 11 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 12 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 13 | Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. |
| 14 | Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 15 | Quoted Amount as per BOQ 1 |
| 16 | GST amount in Percentage Please Enable Macros to View BoQ information |