| 1 | Earth work in cutting in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete. |
| 2 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. |
| 3 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. |
| 4 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. |
| 5 | Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete. |
| 6 | R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. |
| 7 | Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete |
| 8 | P.C.C.1:6:12 in back filling of Abutment including all cost of material, labour and T&P etccomplete. |
| 9 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. |
| 10 | S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete. |
| 11 | S/F 25 mm thick expansion joints i/c cost of material, labour and T&P etc complete. |
| 12 | S/Laying Tarfelt in 3- layers for Bearing slab. i/c all cost of material, labour and T&P etc complete. |
| 13 | Earth work in filling for making ramp in all type soil with all lead & lead i/c all cost of labours t&p etc. complete. |
| 14 | Providing & Laying 1st class Brick on edge soling 110 mm thick on Diversion & Ramp i/c all cost of material, labour and T&P etc complete. |
| 15 | Dismantling Ist class Brick on edge soiling 110 mm thick including all cost of material, labour and T&P etc complete. |
| 16 | Laying Brick on edge soling with old brick including all cost of labour and T&P etc complete |
| 17 | C.C. ( M-20) in 1:1.5:3 wearing coat including all cost of material, labour and T&Petc complete. Please Enable Macros to View BoQ information |