|
| 1 | Earthwork in excavation in foundation in ordinary soil for structure i/c all lead and reqd. lifts as per site requirement and with proper disposal of excavated earth as per directed by engineer in charge for proper completion of work. |
| 2 | Earth work in filling in ordinary soil including ramming and dressing the surface upto required level and slope lead up to 30m and lift up to 1.5m and carriage 600 Km. Including power transport ie. cost of all labour, T&P etc. complete. |
| 3 | Centering and shuttering for form work I/c all cost of labour and T&P etc for complete for proper completion of work. |
| 4 | Centering and shuttering for R.C.Cwork I/c all cost of labour and T&P etc for complete for proper completion of work. |
| 5 | Cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including cost of all material, labour T&P etc complete for proper completion of work. |
| 6 | Cement concrete in (1:3:6) mix with cement, coarse sand , stone grit including cost of all material, labour T&P, mechanical mixing, curing etc complete for proper completion of work. |
| 7 | Laying C.C in M-20 (1:2:4) with cement,coarse sand & crushed stone ballast inccluding coasts of all material labour, mechanical vibration & mixing T&P complete. |
| 8 | R.C.C M-20 (1:1.5:3) with cement, coarse sand & crushed stone ballast including cost of all material, labour, mechanical vibration & mixing T&P etc. complete. |
| 9 | First class B/W in 1:4 cement coarse sand, mortar i/c cost of all material, labour T&P etc. complete for proper completion of work. |
| 10 | Struck pointing in 1:2 cement mortar including cost of all material, labour, T&P, curing etc. complete for proper completion of work |
| 11 | S/L of three layer tarfelt painting including cost of all material, labour T&P etc complete. |
| 12 | Providing and fixing of 75 mm dia P.V.C. pipe cost of all material , labour T&P etc. complete for proper completion of work. |
| 13 | Making 25 mm thick expension joint including cost of all material , labour T&P etc. complete for proper completion of work. |
| 14 | M-100 brick on edge paving I/c joints filled with sand including cost of all material labour T&P etc complete for proper completion of work. |
| 15 | Earth work in excavation in Removing diversion Please Enable Macros to View BoQ information |