| 1 | Schedule 'A' Part-I (Building Work) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as \\"Rs 0.00\\" under Col. 5 siginifies this fact only. |
| 2 | Construction of toilet block alongwith allied infra structure with permanent specifications at 156 INF BN TA, complete all as specified and as shown on drawings |
| 3 | Schedule 'A' Part-II (Internal electrification works) |
| 4 | Total amount of Sch 'A' Part-II (Internal electrification works) brought forward from srl page No-22 |
| 5 | Schedule 'A' Part-III (Internal Water Supply works) |
| 6 | Total amount of Sch 'A' Part-III (Internal Water Supply works) brought forward from srl page No-24 |
| 7 | Schedule 'A' Part-IV (Area drainage Works) |
| 8 | Total amount of Sch 'A' Part-IV(Area drainage Works) brought forward from srl page No-25 |
| 9 | Schedule 'A' Part-V (Sewage disposal Works) |
| 10 | Total amount of Sch 'A' Part-V(Sewage disposal Works) brought forward from srl page No-27 |
| 11 | Schedule 'A' Part-VI (Road/path/hardstanding/culverts Works) |
| 12 | Total amount of Sch 'A' Part-VI (Road/path/hardstanding/culverts Works) brought forward from srl page No-28 |
| 13 | Schedule 'A' Part-VII (External electrification Works) |
| 14 | Total amount of Sch 'A' Part-VII (External electrification Works) brought forward from srl page No-29 |
| 15 | Schedule 'A' Part-VIII (External water supply Works) |
| 16 | Total amount of Sch 'A' Part-VIII (External water supply Works) brought forward from srl page No-30 |
| 17 | Schedule 'A' Part-IX (Hot water Supply Works) |
| 18 | Total amount of Sch 'A' Part-IX (Hot water Supply Works) brought forward from srl page No-31 |
| 19 | Schedule 'A' Part-X (Site clearance and Development Works) |
| 20 | Total amount of Sch 'A' Part-X (Site clearance and Development Works) brought forward from srl page No-32 |
| 21 | Schedule 'A'Part-IX (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as \\"Rs 0.00\\" under Col. 5 siginifies this fact only. |
| 22 | LED tubelight fitting 1x20Watt batten type fitting 4 feet long aluminium extruded housing IP-20 rated rated voltage 230 volts(operating range 140 volt to 270 volts) , 50Hz system wattage 20 Watt +/-10% ,system current not less than 102 mA ,power factor more than 0.95, system lumen efficacy 100 lm /watt ,CCT 6500K complete all accessories prewired and connecting electrically to ceiling rose using PVC insulated and overall sheathed flexible copper conductor of size 0.75 sqmm 3 core all as specidfierd and directed. |
| 23 | Basic all purpose surface and wall mounted LED batten with polycarbonate housing & integrated electronic driver wall mounted LED Batten 10 Watt LED, extruded aluminium heat sink provided for efficient heat dissipation and integrated electronic driver complete all as specified and directed |
| 24 | New generation energy saving and environmental friendly long life LED street light made up of pressure die cast aluminium housing with high power LED as lighting source and lens embedded PC cover having TOP Opening seperate driver compartment with IP66 protection and impact resistance of IK07 with 10KV Built-in Surge Protection Device. of capacity 35 Watt with 3 core 1.5 sqmm multistranded flexible copper conductor cable connection. And fixing of light on brick wall with bracket bend to shape, made out of 40mm dia GI pipe medium grade upto 1.2 mtr long including two sets of MS clamp made out of Flat iron of size 50x6 mm, fabricated to shape and fixed with nuts, bolts & washers & two coats of aluminum paint over a coat of red oxide primer complete all as specified and directed by Engr-in-charge. |
| 25 | Screwing existing steel tubing 40-50 mm dia for alteration or addition lengthening screw on pipe to from connector. All as specified and as directed by Engineer-in-Charge. |
| 26 | Cutting Existing steel tubing 50 mm dia for alteration all as specified and as directed by Engineer-in-Charge. ( earth work shall be measured and paid under external water supply work). |
| 27 | Supply and fixing of Water heater storage type, electric, capacity 50litres 230V,50Hz Minimum BEE star rating of 4 or above. Made of steel body with steel inner tank covered with glass wool with all connected items and fittings like NRV, Safety valve, Hot and cold PVC connection pipe, Hanging Nut bolts etc.(Note:- Allied work schedule of Geyser/Hot water supply is Included in Building Internal works) |
| 28 | Construction of soakage well 1.80 mtr dia and 3.0 mtr deep below inlet (depth) from inlet pipe to ground level 45 cm, including excavation and earth work in any type of soil, PC 1:4:8 type D-2 (using 40 mm graded crushed stone aggregates) in foundation, wall in honey combed brick work in CM 1:4, cover slabg of M-25 (Design mix), filling with brick bats, earth cushion on brick lining on top and inlet pipe 150mm dia, complete all as specified and as shown on drawings. |
| 29 | Construction of conventional type on 20 users with & including earthwork in any type of soil, PCC 1:4:8 below foundation, vent shaft & making connection, complete alol as specified. |
| 30 | 150 mm dia PVC (SWR) pipes single socketed, in any length with rubber ring joints, laid in trenches or in floors. Please Enable Macros to View BoQ information |